Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
H42 w/d
106642
(FO)0000-962-364,C501
3/20/2015
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
damaged units
Type:
Specifications
Question
Date:
1/22/2015 12:13:48 PM
In the specifications it calls out that the units that are damage are to be replaced. Please define what the department views as damaged.
Answer
Date:
1/22/2015 12:23:10 PM
Any damage that would prevent the terminal from functioning properly.
Subject:
asphalt
Type:
Specifications
Question
Date:
1/22/2015 12:08:12 PM
In reviewing of the existing endings there are some on the mainline without asphalt underneath them now. Will we be required to asphalt under units as we replace them?
Answer
Date:
1/22/2015 12:35:25 PM
Unless required by the Engineer, the existing base material type is to remain.
Subject:
traffic control
Type:
Specifications
Question
Date:
1/22/2015 12:07:39 PM
What traffic control will be required for the review of the endings?
Answer
Date:
1/22/2015 12:31:53 PM
All traffic control measures are to be in accordance with the Virginia Work Area Protection Manual.
Subject:
timeline
Type:
Proposal
Question
Date:
1/22/2015 12:07:10 PM
Since there are several miles to cover in each district, can all of the review be completed prior to starting the installation of the new units to allow for minimization of travel for the crews doing the installation and then go out and start the installation once the review is complete?
Answer
Date:
1/22/2015 2:25:14 PM
The "Identify and Categorize" specification speaks to this issue.
Subject:
Mandatory Pre-Bid
Type:
Other
Question
Date:
1/6/2015 8:55:25 AM
The scheduled pre-bid date for this project of December 22nd was during the peak of the holiday season. Due to personnel scheduling conflicts normally experienced during this time, we request the mandatory attendance requirement be waived and/or a second conference be scheduled.
Answer
Date:
1/7/2015 1:46:17 PM
The project was advertised on December 11th with the showing date set, the advertisement followed our normal procedures for posting on eVA, the CABB system and email alerts. It is not our intent to vary from that process.
Question
Date:
1/6/2015 5:38:28 PM
Please see Page 1 in the project proposal under section “REQUIRED ATTENDANCE OF PROJECT SHOWING” that mandates the requirements for a bidder to be considered responsive. Please note the singular use of the word “Showing” throughout the paragraph.
Answer
Date:
1/7/2015 1:34:44 PM
Can you please provide further explanation as to why the singular use of showing is relevant?
Subject:
Furnished Materials
Type:
Plan
Question
Date:
12/31/2014 12:51:54 PM
Will there be a forklift provided by VDOT at storage facilities to assist in loading furnished materials?
Answer
Date:
12/31/2014 3:25:25 PM
No.
Subject:
Site Preparation
Type:
Plan
Question
Date:
12/31/2014 12:50:40 PM
It is noted in the proposal that Site Preparations are to be included in the price of Installing GR-9 Terminals and Replacing GR-9 Terminals. Being that this is an interstate project are the site preparations to be constructed utilizing asphalt material in accordance with Standard 201.08? If so, the Department should add a pay item for Asphalt Material to address this issue.
Answer
Date:
1/6/2015 3:26:52 PM
According to the specification the cost shall be included in the price bid for other items in the Contract, and no additional compensation will be made.
Subject:
Underground Utilities
Type:
Plan
Question
Date:
12/31/2014 12:47:39 PM
Are there any VDOT owned underground utilities within the identified work limits and if so what is the process and time frame for having said utilities located?
Answer
Date:
12/31/2014 3:25:34 PM
As with any road project, there may be underground utilities. The contractor will be required to have them marked by Miss Utility and VDOT. The VDOT contact will be identified at the preconstruction conference.
Displaying questions 1 - 8 (of 8)
Page: