Question
|
|
Date:
|
4/18/2013 2:13:51 PM
|
|
Where does the sleeper pad next to the approach slab at the bridge get covered for payment?
|
|
Answer
|
Date:
|
|
|
|
|
|
|
|
|
Question
|
|
Date:
|
4/18/2013 2:12:23 PM
|
|
Which pay item compensates for the MS-1 over the bridge deck?
|
|
Answer
|
Date:
|
4/19/2013 1:56:46 PM
|
|
MS-1 Median Strip is under the Concrete Class A4 item and the reinforcement is under the CRR steel item.
|
|
|
|
|
|
Question
|
|
Date:
|
4/17/2013 11:44:14 AM
|
|
Note D-4 states that fill should be placed and allowed to settle and displace all soft materials from station 33+00 to 46+00. Does this mean that all fill within these stations will have to be placed to proposed grades and allowed to settle prior to the installation drainage pipe and structures? Is there a minimum time requirement that the fill will have to settle prior to drainage installation? How will the settlement be monitored and who is responsible for monitoring the settlement? If the above is correct, D-4 also states that the cost for removing the fill and back filling is to be included in the price for regular excavation. Will the volume material removed down to the original ground be measured as regular excavation and paid for at the regular excavation unit price? Will this volume be measured for each time it is handled.
|
|
Answer
|
Date:
|
4/19/2013 2:30:18 PM
|
|
Note D-4 may be disregarded during bidding as it will be stricken from the final plans.
|
|
|
|
|
|
Question
|
|
Date:
|
4/17/2013 7:38:08 AM
|
|
The note on sheet 2U of the drawings states that suitable on-site regular excavation is to be used on this project before using off-site borrow material. Please indicate the criteria that the on-site material would need to meet to be considered suitable.
If suitable on-site material is encountered, can this material be used for backfill of pipe trenches within the roadway?
|
|
Answer
|
Date:
|
4/19/2013 1:59:50 PM
|
|
Yes, and keep in mind that drain pipe is considered a “minor structure” and reference the following sections as taken from the Specifications….Section 302.03(g) page # 291; Section 303.04 (a, b, d, g, k) page nos. 304, 305, 306, 307, and 312; Section 303.06(a)(1, 2, 3); page nos. 314, 315, and 316.
|
|
|
|
|
|
Question
|
|
Date:
|
4/19/2013 2:34:52 PM
|
|
Will on site material need to meet the CBR-20 requirement to be considered suitable? If no, what is the criteria for on site material to be considered suitable?
|
|
Answer
|
Date:
|
4/23/2013 2:51:09 PM
|
|
For on-site material to be considered suitable, the material must meet the specifications for the application in which it is being used, see the VDOT Road and Bridge Specifications. For example, that would apply to CBR-20 if the material is to be used in an area designated as needing CBR-20, or apply to top soil if the material is to be used in an area designated as needing top soil. The contractor is responsible for verifying on-site material meets the applicable specification in whatever location the contractor requests permission for its use. The Engineer must approve the use of the on-site material.
|
|
|
|
|
|
Question
|
|
Date:
|
4/12/2013 8:30:12 AM
|
|
Line Item 1100 (GR-11) quantity was revised in Revision Letter #1 from 2 to 1. The quantity remains 2 in Expedite.
|
|
Answer
|
Date:
|
4/12/2013 3:55:35 PM
|
|
The original quantity before addendum 1 was published was 1 each for GR-11 terminal. The Addendum quantity on line 1100 was revised to 2.
|
|
|
|
|
|
Question
|
|
Date:
|
4/12/2013 8:18:16 AM
|
|
The line item 750 quantity (MH-1 or 2) was revised by Revision Letter #1 from 258 to 263. The quantity for that line item in Expedite is 286.90. Please clarify.
|
|
Answer
|
Date:
|
|
|
|
|
|
|
|
|
Question
|
|
Date:
|
4/11/2013 4:07:39 PM
|
|
I don't see the Sound Wall Design Sheet #30 listed on Falcon. Please advise.
|
|
Answer
|
Date:
|
4/12/2013 2:55:03 PM
|
|
You should be able to see it now.
|
|
|
|
|
|
Question
|
|
Date:
|
4/10/2013 1:58:34 PM
|
|
The MOT plans call for temporary pavement widening in stage 1 of phases 1 & 2. The detail for the temp widening doesn't include the 2' undercut and back fill with CBR20 which is called for in the plans in many of the same locations. Will the 2' undercut, fabric and CBR20 back-fill have to be installed during the stage 1 temporary pavement installation of each phase or is the intent to remove the temporary widening and perform the undercut during stage 3 of each phase? If it is done during stage 3, will the temporary widening removal be paid for as demolition of pavement?
|
|
Answer
|
Date:
|
4/16/2013 9:35:14 AM
|
|
Given the high ADT of this project, and the need to maintain two lanes of traffic in each direction, having a good foundation for the temporary pavement will be essential. The 2 ft of undercut and CBR20 backfill, shown on the plans, shall be installed as part of the temporary pavement.
|
|
|
|
|
|
Question
|
|
Date:
|
3/22/2013 3:22:53 PM
|
|
Typically traffic signal loops are 3/8" wide and the tails for the loop wire is 5/8"
Will a item be added for the 3/8" saw cutting or will all saw cutting to be require to be 5/8" wide
|
|
Answer
|
Date:
|
4/3/2013 3:34:55 PM
|
|
You are correct. The addendum will correct this.
|
|
|
|
|
|
Question
|
|
Date:
|
3/22/2013 10:28:13 AM
|
|
Is the Liquid Asphalt subject top asphalt price adjustment?
|
|
Answer
|
Date:
|
3/24/2013 11:31:41 AM
|
|
See the provision entitled Asphalt Material Eligible for Price Adjustment on page 98 for the proposal. Also see form C-21B for items eligible for fuel adjustment.
|
|
|
|
|
|
Question
|
|
Date:
|
3/21/2013 9:53:24 AM
|
|
This project includes a large amount of existing drainage pipe and structures to be removed which will create voids in the trench. Will the contractor be reqiured to backfil these voids and/or the trench with CBR-20 material? If so, will this be paid per unit price?
|
|
Answer
|
Date:
|
3/24/2013 2:13:24 PM
|
|
1.~~ There are pay items for the removal of existing pipes and drainage structures. See Incidental Summary Sheet 2P.
~~2.~~ In locations where existing pipes or drainage structures will be replaced with new pipes or drainage structures, the cost of the backfill is included in the cost of the new pipe or drainage structure. See Sheet 2, General Notes, Additional Drainage, Note 1.
~~3.~~ In locations where the existing pipe, or drainage structure, is to be removed, and not replaced with a new pipe, or drainage structure, the backfill is included in the cost of removing the pipe or drainage structure. Spec 510.04 Backfilling will be included in the price of the pay item Remove existing (Pipe Culvert)
~~4.~~ When removing pipes or drainage structures within the roadway prism the backfill shall be CBR-20. See Sheet 2, General Notes, Additional Drainage, Note 2.
~~5.~~ When removing pipes or drainage structures outside of the roadway prism excavated material may be used. See Sheet 2, General Notes, Additional Drainage, Note 3.
|
|
|
|
|
|
Question
|
|
Date:
|
4/17/2013 11:14:21 AM
|
|
In regards to the last answer pertaining to back filling pipes or structures outside of the roadway prism, can you provide a description of what constitutes the "roadway prism"? i.e.; would the the roadway prism be considered the structural fill directly beneath the pavements (stone & asphalt) or does it include area beyond the edge of stone extending out at 1.5:1 or 2:1 slope?
|
|
Answer
|
Date:
|
4/19/2013 2:05:19 PM
|
|
The roadway prism includes the area beneath the roadway, extends beyond the back of curb, or edge of paved shoulder, and across any sidewalk or shared use path to the hinge point where the 2:1, 3:1, etc. slope begins.
|
|
|
|
|
|
Question
|
|
Date:
|
4/10/2013 2:04:31 PM
|
|
Plan sheet 2, Additional drainage note (1) states that the backfill material for drainage pipe is included in the cost of the pipe. Is the cost for back-fill of drainage structures to be included in the cost of the structure?
|
|
Answer
|
Date:
|
4/16/2013 9:36:03 AM
|
|
According to section 302 of the specifications, the backfill of drainage structures is included in the bid price for such items.
|
|
|
|
|
Displaying questions 1 - 10 (of 34)