Question
|
|
Date:
|
2/18/2013 9:56:46 AM
|
|
The Department has indicated that the "Schedule of items" Line Number 0100 is for Bedding Material # 57 Stone and Line Number 0620 is for Geotextile Drainage Fabric however, the bid quantities that are represented in these items do not include the # 57 stone and Geotextile paper that will be needed for the Underground SWM 9-4. Is the department stating that the 57 stone and the geotextile paper will be paid under these items with an over run of quantities or will the department adjust thequanties to include the stone and geo paper for the Underground SWM 9-4?
|
|
Answer
|
Date:
|
2/20/2013 3:26:05 PM
|
|
For the underground detention facility (SWM 9-4), the gravel backfill material and the geotextile cloth shall be included in the price for the related pipe.
|
|
|
|
|
|
Question
|
|
Date:
|
2/18/2013 9:56:16 AM
|
|
The Department has indicated that the "Schedule of items" Line Number 0100 is for Bedding Material # 57 Stone and Line Number 0620 is for Geotextile Drainage Fabric however, the bid quantities that are represented in these items do not include the # 57 stone and Geotextile paper that will be needed for the Underground SWM 9-4. Is the department stating that the 57 stone and the geotextile paper will be paid under these items with an over run of quantities or will the department adjust thequanties to include the stone and geo paper for the Underground SWM 9-4?
|
|
Answer
|
Date:
|
|
|
|
|
|
|
|
|
Question
|
|
Date:
|
2/2/2013 6:49:24 AM
|
|
If the existing power service is not adequate to handle the new requirements for lighting, who is responsible for the cost of the power company to upgrade?
|
|
Answer
|
Date:
|
2/19/2013 3:59:20 PM
|
|
The cost for the new secondary conductor and CT service will be provided by Dominion Virginia power at no cost to the contractor. Any costs associated with service relocation, service upgrade or upgrade to primary lines associated with VDOT services will be VDOT cost.
|
|
|
|
|
|
Question
|
|
Date:
|
2/18/2013 12:26:39 PM
|
|
Will VDOT also specify what service they want and add a pay item? SE-9? There is no pay item for the service, only the control center and according to the road and bridge specs. They are two seperate paid items.
|
|
Answer
|
Date:
|
2/22/2013 3:46:18 PM
|
|
A new Electrical Service will be requested by VDOT to Virginia Dominion Power. Contractor shall provide new Control Center and coordinate with Dominion Virginia Power for proper connections.
|
|
|
|
|
|
Question
|
|
Date:
|
1/31/2013 11:28:49 AM
|
|
On page 11 (9D) is the 60" pipe solid or perforated? Also how is the # 57 aggregate AND the geo textile paper paid for this item. It is not included in the summary.
|
|
Answer
|
Date:
|
2/15/2013 1:02:26 PM
|
|
Plan sheet 11(9D) indicates “205 LF 60” PIPE WATERTITE JOINTS (TYP.). The joints are watertight, the pipe should be solid rather than perforated. In the “Schedule of Items” Line Number 0100 is for BEDDING MATL. AGGR. NO. 57 STONE and Line Number 0620 is for GEOTEXTILE DRAINAGE FABRIC.
|
|
|
|
|
|
Question
|
|
Date:
|
1/22/2013 9:54:35 AM
|
|
There are numerous questions that have not been answered. VDOT should consider delaying receipt of bids.
|
|
Answer
|
Date:
|
1/22/2013 11:09:40 AM
|
|
VDOT has decided to delay the receipt of bids until Feb. 27, 2013.
|
|
|
|
|
|
Question
|
|
Date:
|
1/18/2013 11:26:43 AM
|
|
The lighting plans call for a new control center CCW1 type D but makes no mention of the actual service. The existing service appears to be 120/240v and all the new lighting is 3 phase 277/480V. Will there be a new service as well. please advise
|
|
Answer
|
Date:
|
1/22/2013 2:32:37 PM
|
|
Plan note #12 on sheet 15(2) says that the contractor will have to contact the local electrical company for electrical service.
|
|
|
|
|
|
Question
|
|
Date:
|
1/28/2013 4:06:04 PM
|
|
There is no Service type shown nor is there a pay item for "electrical service" Will the service be incedental to the Control Center " CCW1" or will VDOT be specifying the type of service they will want? For bidding purposes we request VDOT clarify this because the Control center and electrical service typiclly are separate pay items
|
|
Answer
|
Date:
|
1/30/2013 7:01:34 AM
|
|
The panel schedule calls for a 100 AMPS, 277/480 AMPS main breaker. The factors include overall load and load side conductor specifications. The contractor electrician would need to provide Dominion Virginia Power a load letter so they can determine if the load will be adequate or exceed the existing transformers capacity. The contractor needs to take in consideration his electrician’s cost for conduit, CT’s/CT cabinet and remote meter installation.
|
|
|
|
|
|
Question
|
|
Date:
|
1/22/2013 3:45:30 PM
|
|
Typically VDOT arranges for and pays for new power drops. The Contractor normally installs the service panel and the Power Company brings the service to the panel. This is usually done by VDOT. Regardless of the note #12, who is paying for the cost of the service?
|
|
Answer
|
Date:
|
1/25/2013 3:51:10 PM
|
|
Pay item # 55353.
|
|
|
|
|
|
Question
|
|
Date:
|
1/17/2013 3:21:27 PM
|
|
Please advise which bid items the existing storm drain RCP and inlet removals are to be paid for.
|
|
Answer
|
Date:
|
1/22/2013 11:55:21 AM
|
|
To be paid under ‘Regular Excavation’ (see Note G-4 on Sheet 2). Drainage facilities to be abandoned and left in place shall be backfilled and plugged with ‘Flowable Backfill” (see Note D-12 on Sheet 2).
|
|
|
|
|
|
Question
|
|
Date:
|
1/17/2013 11:06:42 AM
|
|
Drawing 11(3A) Note 3 calls out 6" pipe to be SDR 35M, the special provisions for Bioretention Facilities sec. III calls for the underdrain to be rigid schedule 40 pipe. Which is correct?
|
|
Answer
|
Date:
|
1/22/2013 1:10:30 PM
|
|
Pipe shall conform to special provision requirements.
|
|
|
|
|
|
Question
|
|
Date:
|
1/17/2013 11:00:55 AM
|
|
Specification Section 501.03 (C) requires video inspection of underdrain. Will this be required for the 6" pipe in the SWM areas? If so is it incidental to the 6" pipe item or will it be paid under bid item 0160 - Post Installation Inspection?
|
|
Answer
|
Date:
|
1/22/2013 1:12:05 PM
|
|
Per VTM 108, all accessible outlet locations up to a minimum of 10% of longitudinal pipe shall be inspected. Where an outlet location is inaccessible with video camera, visual inspection will be permitted. The inspection will be incidental to the cost of the underdrain pipe.
|
|
|
|
|
|
Question
|
|
Date:
|
1/17/2013 10:40:57 AM
|
|
Per plan sheet 11(6), drainage unit 6-4 has a st'd EW-2 for the 54" storm sewer pipe. Please advise where the 54" EW-2 is to be paid for.
|
|
Answer
|
Date:
|
1/22/2013 1:12:43 PM
|
|
EW-2 for the 54” pipe is to be paid for under Item 525, “Concrete Class A3”.
|
|
|
|
|
|
Question
|
|
Date:
|
1/17/2013 9:59:42 AM
|
|
What is the thickness of the existing pavement to be demolished?
|
|
Answer
|
Date:
|
1/17/2013 2:44:45 PM
|
|
-The northern existing parking lot 3”-4”.
- The school access road 3.5”.
- Existing roads at proposed roundabout 3”.
|
|
|
|
|