Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
A06 101435 0661-034-801, C501 4/17/2026
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Erosion & Sediment Control Type: Plan
Question Date: 4/17/2026 2:53:08 PM
Sheet 8C (2) – Erosion & Sediment Control… is missing from the A06_101435 Plan Set. Will it be posted before the bid date?  
Answer   Date: 4/20/2026 4:23:24 PM
Sheet 8C(2) will be provided as a post award revision. This sheet delineates E&S for obscuring of pavement along existing Redbud Road. All E&S and obscuring quantities associated with this sheet are accounted for in the quantity summary and bid proposal.  
 
Subject: Traffic Signal Plans Type: Plan
Question Date: 4/17/2026 10:48:58 AM
Item 810 description in the bid items says communication equip. NS Modify existing controller cabinet. The special provisions for this item do not mention any communication equipment specifically, and the plans do not mention anything about changing communication equipment out. What type of communication equipment we are to modify? Or is the full intent of the modification of the cabinet to change the programming in the controller as noted on the plans and remove the load switches from phase 4 and disable phase 4 leaving the light operating in either phase 2-5 or phase 2-6 with the FYA?  
Answer   Date: 4/20/2026 12:28:02 PM
There are no communication changes required for the controller cabinet.  
 
Subject: Field Office Type III Type: Bid Sheet
Question Date: 3/23/2026 10:59:16 AM
Please verify the quantity for Field Office Ty. III. There appears to be a discrepancy between the fixed completion date of October 1, 2027 (approximately 17 months from bid letting) and total quantity of field office (7 months).  
Answer   Date: 3/25/2026 3:26:09 PM
Addendum forthcoming.  
 
Subject: Geotechnical Report Type: Other
Question Date: 3/20/2026 2:29:37 PM
Is a geotechnical report available for this project?  
Answer   Date: 3/23/2026 8:07:47 AM
The Geotechnical report is now available.  
 
Subject: cabb Documents incomplete Type: Plan
Question Date: 3/12/2026 8:29:04 AM
Only the proposal file is posted to cabb for Order A06. When will associated plan set and any other files, i.e. reports, MicroStation files, etc. be available?  
Answer   Date: 3/12/2026 11:07:07 AM
The files are now available for contractors to view. The merged sets were completed as well.  
 

Displaying questions 1 - 5 (of 5)
Page: 1 First Previous Next Last