Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
M91
122866
0460-060-880, M501
7/18/2025
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
MH-2
Type:
Plan
Question
Date:
7/18/2025 6:37:31 PM
Is MH-2 a doghouse manhole? Is it permissible to cover the MH-2 excavation with steel plates if work cannot be complete3d in one night?
Answer
Date:
7/21/2025 3:47:31 PM
Yes, this is a doghouse manhole (See drainage description 4-2 on Sheet 4). The use of steel plates to cover the manhole excavation are permissible, however, these shall be approved by the Engineer prior to use.
Subject:
Storm Drain 4-1 - 4-2
Type:
Plan
Question
Date:
7/18/2025 6:35:45 PM
Note 5 on Plan Sheet 1E(3) states " Restore pavement section in a manner to open traffic at the end of the night work". Is full depth stone backfill will steel plates acceptable? Please also note the UB-1 concrete encasement around the 12" water shown on shown on sheet 4A (2). In order to open the road to traffic at the end of the night, stone backfill may need to be placed prior to initial set of the concrete. Is this permissible? could the trench be cover with steel plates if backfill cannot be completed prior to 6 A.M. ?
Answer
Date:
7/21/2025 3:48:03 PM
Steel plates maybe used if the trench can’t be backfilled by the end of the work day/night. However, use of steel plates shall follow Virginia Work Area Protection Manual Section 6G.15 and be approved by the Engineer prior to use.
Subject:
Traffic Control
Type:
Plan
Question
Date:
7/18/2025 6:15:46 PM
The work will require three independent lane closures each day / night. To expedite the closure setup, can Group 2 Channelizing devices be placed in median / shoulder rather than removing each day / night? Can roll up signs be turned away from traffic rather than removed each day / night?
Answer
Date:
7/21/2025 3:48:33 PM
These traffic control devices shall be removed at the end of each work day/night.
Displaying questions 1 - 3 (of 3)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
6/25/2026 12:42:43 AM
2008