Question
|
|
Date:
|
8/22/2025 3:36:52 PM
|
|
Will precast box culverts be allowed that are split horizontally? I.E. there is a horizontal joint and a top and bottom section of the box.
|
|
Answer
|
Date:
|
8/25/2025 2:00:15 PM
|
|
Horizontal construction joints will not be permitted in the precast box culverts. Please refer to the Sheet 2 of the road plans, General Note D-15. Also, please refer to Section 302.03 3.(a) of the VDOT Road and Bridge Specifications which states, "Precast Box Culverts shall conform to the applicable material requirements of ASTM C1577. The design shall be a Special Design that need not conform to the reinforcing steel and geometry shown in the design tables and the appendix in ASTM C1577." Specification ASTM C1577 covers single-cell precast reinforced concrete box sections cast monolithically. As precast box sections are intended to be cast monolithically per ASTM C1577, horizontal construction joints will not be permitted in the precast box culverts.
|
|
|
|
|
|
Question
|
|
Date:
|
8/21/2025 1:41:31 PM
|
|
Plan Sheet 2B shows 1338 Tons of Cement Stabilized Aggr Base Matl Ty.1n.21A under the MOT Summary. Please confirm this is the correct type of stone.
|
|
Answer
|
Date:
|
8/22/2025 1:28:30 PM
|
|
Plan Sheet 2B is being corrected by addendum.
|
|
|
|
|
|
Question
|
|
Date:
|
8/19/2025 2:39:05 PM
|
|
Can you please update ProjectWise with the R6 modified plan sheets?
|
|
Answer
|
Date:
|
8/19/2025 2:52:27 PM
|
|
The revised plans are now available.
|
|
|
|
|
|
Question
|
|
Date:
|
8/18/2025 3:50:44 PM
|
|
Please clarify the temporary sheet pile line item. Will the SF quantity of sheet piling be paid regardless of method of shoring used?
|
|
Answer
|
Date:
|
8/20/2025 2:10:26 PM
|
|
Please bid this this item as shown in the bid documents. As with any requested change, the successful bidder may submit an alternative shoring method for the Department's review and consideration.
|
|
|
|
|
|
Question
|
|
Date:
|
8/14/2025 3:31:06 PM
|
|
Can you please review the gabion design on plan sheets 15C(10), 15C(12), 15C(6), and 15C(8)? The bioretention soil will not support the gabion baskets as shown.
|
|
Answer
|
Date:
|
8/18/2025 2:22:08 PM
|
|
This will be addressed in a forthcoming addendum, which will include corrected details showing the gabion baskets supported by normal fill material.
|
|
|
|
|
|
Question
|
|
Date:
|
8/13/2025 3:53:07 PM
|
|
It appears there will need to be eradicated linear and nonlinear pavement markings. Can you create bid items for each of these activities?
|
|
Answer
|
Date:
|
8/14/2025 2:33:18 PM
|
|
The Department has confirmed that a pay item is needed for the eradication of linear pavement markings. This is being addressed in a forthcoming addendum.
|
|
|
|
|
|
Question
|
|
Date:
|
8/13/2025 3:17:35 PM
|
|
As there are a large quantity of updated plans from Addendum 3 can you please post these in Merged plansets?
|
|
Answer
|
Date:
|
8/14/2025 1:25:00 PM
|
|
Revised plans and merged plan set are now available.
|
|
|
|
|
|
Question
|
|
Date:
|
8/12/2025 7:46:43 AM
|
|
Can you please release the addendum shortly?
|
|
Answer
|
Date:
|
8/12/2025 8:02:31 AM
|
|
Addendum will be issued this week. Thank you.
|
|
|
|
|
|
Question
|
|
Date:
|
8/8/2025 2:08:29 PM
|
|
Is the bioretention soil media VDOT special provision biofilter or DEQ biofilter media?
|
|
Answer
|
Date:
|
8/11/2025 1:19:07 PM
|
|
The bioretention soil media shall meet the DEQ biofilter media requirements.
|
|
|
|
|
|
Question
|
|
Date:
|
8/8/2025 8:43:31 AM
|
|
What is the criteria for drill and grout dowels to connect the new culvert sections to the existing?
|
|
Answer
|
Date:
|
8/11/2025 12:01:48 PM
|
|
Standard BCE-01 states, "¾” diameter Headed Expansion Bolts shall be placed between layers of reinforcing steel at a spacing not to exceed 1’-6" c.-c. Embedment into new and existing concrete is to be in accordance with the current V.D.O.T. Road and Bridge Specifications." Specifically, Section 412.03 (a) of the VDOT Road & Bridge Specifications provides additional requirements for joining new concrete to existing concrete.
|
|
|
|
|
|
Question
|
|
Date:
|
8/8/2025 11:24:30 AM
|
|
There is nothing on BCE-01 that addresses this question.
|
|
Answer
|
Date:
|
8/11/2025 11:49:37 AM
|
|
Standard BCE-01 states, "¾” diameter Headed Expansion Bolts shall be placed between layers of reinforcing steel at a spacing not to exceed 1’-6" c.-c. Embedment into new and existing concrete is to be in accordance with the current V.D.O.T. Road and Bridge Specifications." Specifically, Section 412.03 (a) of the VDOT Road & Bridge Specifications provides additional requirements for joining new concrete to existing concrete.
|
|
|
|
|
|
Question
|
|
Date:
|
8/8/2025 11:23:24 AM
|
|
There is nothing on BCE-01 that addresses this question.
|
|
Answer
|
Date:
|
8/11/2025 12:02:09 PM
|
|
Standard BCE-01 states, "¾” diameter Headed Expansion Bolts shall be placed between layers of reinforcing steel at a spacing not to exceed 1’-6" c.-c. Embedment into new and existing concrete is to be in accordance with the current V.D.O.T. Road and Bridge Specifications." Specifically, Section 412.03 (a) of the VDOT Road & Bridge Specifications provides additional requirements for joining new concrete to existing concrete.
|
|
|
|
|
|
Question
|
|
Date:
|
7/11/2025 9:49:24 AM
|
|
Please provide joint connection details for new to existing concrete elements, such as drill and grout dowels.
|
|
Answer
|
Date:
|
7/11/2025 1:54:31 PM
|
|
Per the drainage descriptions (Sheets 15a(1) and 15a(2)) for Structures 8-11 and 10-10, the VDOT standard detail BCE-01 should be utilized for the connection of the existing and proposed box culvert.
|
|
|
|
|
|
Question
|
|
Date:
|
8/8/2025 11:24:30 AM
|
|
There is nothing on BCE-01 that addresses this question.
|
|
Answer
|
Date:
|
8/11/2025 11:49:37 AM
|
|
Standard BCE-01 states, "¾” diameter Headed Expansion Bolts shall be placed between layers of reinforcing steel at a spacing not to exceed 1’-6" c.-c. Embedment into new and existing concrete is to be in accordance with the current V.D.O.T. Road and Bridge Specifications." Specifically, Section 412.03 (a) of the VDOT Road & Bridge Specifications provides additional requirements for joining new concrete to existing concrete.
|
|
|
|
|
|
Question
|
|
Date:
|
8/8/2025 11:23:24 AM
|
|
There is nothing on BCE-01 that addresses this question.
|
|
Answer
|
Date:
|
8/11/2025 12:02:09 PM
|
|
Standard BCE-01 states, "¾” diameter Headed Expansion Bolts shall be placed between layers of reinforcing steel at a spacing not to exceed 1’-6" c.-c. Embedment into new and existing concrete is to be in accordance with the current V.D.O.T. Road and Bridge Specifications." Specifically, Section 412.03 (a) of the VDOT Road & Bridge Specifications provides additional requirements for joining new concrete to existing concrete.
|
|
|
|
|