Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
M54
121890
0602-029-603, B665
4/18/2025
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Proposal Submission
Type:
Proposal
Question
Date:
4/21/2025 10:12:09 AM
I apologize for asking after the deadline but we are wondering if this project will be extended. We are still waiting on responses to questions and want to plan accordingly. Thank you for your consideration.
Answer
Date:
4/21/2025 12:10:35 PM
Answers to all CABB questions have been posted and bid letting date will not be extended.
Subject:
Submission
Type:
Proposal
Question
Date:
4/18/2025 2:53:33 PM
Please confirm all documents required for bid submission.
Answer
Date:
4/21/2025 12:10:52 PM
Please clarify this question.
Subject:
Drawing 3 of 9
Type:
Plan
Question
Date:
4/17/2025 2:35:16 PM
Note D) “Grind minor defects in the web and in the bottom of flange Beam 3” Question: Please advise what is the maximum amount of material can be remove before the Beam should be replace.
Answer
Date:
4/21/2025 10:51:06 AM
For acceptable procedures for Grinding Minor Defects, including permissible limits of base metal removal, see Section 426.03(a) of the Specifications under Surface Preparation.
Subject:
Existing
Type:
Specifications
Question
Date:
4/17/2025 2:34:55 PM
Drawing and site visit have found that there are existing utilities under the road adjacent to the beam. If the requirement for the repair needs the utilities to be removed will VDOT be responsible for the shut down and removal of the utility or will that responsibility fall on the contractors.
Answer
Date:
4/21/2025 10:50:36 AM
Heat straightening activities for Beams 3 and 6 are away from the utilities shown in plans. Beyond that, it is anticipated that the remaining diaphragm and beam repairs can be completed without impacts to adjacent utilities.
Subject:
Existing/Drawing sheet 4 of 9
Type:
Plan
Question
Date:
4/17/2025 2:34:38 PM
The drawing stated existing Diaphragm removal and replacement detail; can we reuse the diaphragm if found to be in good condition?
Answer
Date:
4/21/2025 10:49:57 AM
No. To minimize the impact to the traffic and avoid future maintenance issues, the intent is to replace the diaphragms per plan.
Subject:
Specification/Drawing page 3 of 9
Type:
Plan
Question
Date:
4/17/2025 2:34:23 PM
In the drawing on note B) it stated, “Heat straighten Beam 3 and perform nondestructive testing in accordance with Section 426.03 of the Specifications.” The section was not included in the specification. Question: Could you please provide the missing specifications?
Answer
Date:
4/21/2025 10:49:20 AM
Section 426.03 regarding procedures for repairing existing steel structures can be found in the Virginia Department of Transportation Road and Bridge Specifications, 2020. Section 426.03(b)1 under Surface Preparation includes testing requirements following completion of heat straightening.
Subject:
Existing
Type:
Specifications
Question
Date:
4/17/2025 2:34:04 PM
SEG has contacted multiple steel fabrication and testing companies, and they are all asking if the damage is on the flange of the beam or has the damage spread to the web of the beam. Question: Has there been any test or evaluation done on the bridge prior to the design? Question: If so, could we acquire a copy of the test/evaluation report?
Answer
Date:
4/21/2025 10:48:36 AM
The repair limits provided in the Plans 189-25E & 189-25D address the defects as observed during the in-depth bridge inspection and nondestructive testing were conducted to confirm the necessary repair limits.
Subject:
Advertised Project Value
Type:
Proposal
Question
Date:
4/17/2025 11:23:08 AM
Is the advertised value of $1,295,000 correct for this project?
Answer
Date:
4/17/2025 11:49:32 AM
Yes, the advertised value of $1,295,000 is correct for this project.
Displaying questions 1 - 8 (of 8)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
12/15/2025 4:36:14 AM
2008