Subject: inspections Type: Other
Question Date: 9/18/2024 11:30:40 AM
What will be the procedure for inspections by VDOT or third parties hired by VDOT? Will they provide their own access to the work or will they need to be on our platforms and barges?  
Answer   Date: 9/20/2024 12:25:58 PM
Please refer to the current VDOT Road and Bridge Specifications, Section 105.17. The Contractor shall provide the Engineer and Inspectors full and safe access to all parts of the Work.  
 
Subject: drilling Type: Other
Question Date: 9/18/2024 11:29:57 AM
If we need to drill into the concrete, what will be the process for determining where it will be permitted to drill?  
Answer   Date: 9/20/2024 12:26:18 PM
The Contractor shall locate the existing reinforcement to ensure the new connection will not conflict with the existing pier rebar. See Special Provision Copied Note for Rest Bent Walkway.  
 
Subject: Aa Builts Type: Plan
Question Date: 9/18/2024 11:29:41 AM
Are As-Builts available for this project? if so, can they be made available on CABB?  
Answer   Date: 9/23/2024 9:20:28 AM
As-builts are now available.  
 
Subject: drilling concrete Type: Specifications
Question Date: 9/18/2024 11:29:28 AM
s it permissible to drill anchor bolts in the abutment wherever needed, or do we need to avoid drilling through rebar?  
Answer   Date: 9/20/2024 12:27:05 PM
The Contractor shall locate the existing reinforcement to ensure the new connection will not conflict with the existing pier rebar. See Special Provision Copied Note for Rest Bent Walkway.  
 
Subject: stainless components Type: Specifications
Question Date: 9/18/2024 11:28:51 AM
May we use new stainless steel straps or brackets as part of the support for the new FRP structure?  
Answer   Date: 9/20/2024 12:27:36 PM
The walkway to existing pier connection hardware shall be Stainless Steel Type 316. The contractor shall submit the design for review and approval by the Department.  
 
Subject: existing bolts Type: Other
Question Date: 9/18/2024 11:28:07 AM
Are we to use the existing bolt/studs that hold the existing walkway to the concrete, to fasten and support the new walkway?  
Answer   Date: 9/20/2024 12:27:56 PM
The new walkway shall use new connection hardware. See Special Provision Copied Note for Rest Bent Walkway.  
 
Subject: parking Type: Other
Question Date: 9/18/2024 11:18:44 AM
Can we get authorization to park on the gravel area on the north side of the West approach for contractor vehicles during the work as long as we leave a space for the bridge tender to park?  
Answer   Date: 9/20/2024 12:28:20 PM
Locations for staging of equipment and storage of equipment is the responsibility of the contractor. Please refer to The VDOT Road and Bridge Specifications Section 106.08 – Storing Materials.  
 
Subject: work platform Type: Other
Question Date: 9/18/2024 11:17:57 AM
Will we be allowed to put a temporary platform on top of the east fendering structure to gain access to the east walkway structure?  
Answer   Date: 9/20/2024 12:28:54 PM
The Contractor shall not moor or attach marine vessels to the existing timber fender or dolphin. The Contractor shall not use the existing fendering structure for temporary work platforms. See Materials of Construction Notes on Sheet 2r3. Please refer to The VDOT Road and Bridge Specifications Section 107.21d – Construction Loading of Structures.  
 
Subject: Mooring Type: Other
Question Date: 9/18/2024 11:17:25 AM
Will we be allowed to moor a work barge to the rest bents and to the outside of the fendering structure (landward side) during the prosecution of the work, if we use the proper cushioning materials to prevent any abrasion or impact to the pilings?  
Answer   Date: 9/20/2024 12:29:20 PM
The Contractor shall not moor or attach marine vessels to the existing timber fender or dolphin. See Materials of Construction Notes on Sheet 2r3.  
 
Subject: ladders in scope? Type: Specifications
Question Date: 9/18/2024 11:15:55 AM
Are the access ladders from the bridge deck to be replaced as part of the scope?  
Answer   Date: 9/20/2024 12:29:44 PM
Access ladders from the bridge deck are not included as part of the scope.  
 