Project Info
Order Number UPC State Project Number Last Date to Post Questions
G75 97112 0720-082-751, B684, C501 3/18/2022
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Level Spreader Type: Bid Sheet
Question Date: 3/18/2022 4:51:32 PM
There are two shown on the plans. There is only 1 Each on the bid sheet.  
Answer   Date:
 
 
Subject: Embankment CBR Value Type: Plan
Question Date: 3/18/2022 11:34:10 AM
Would the department answer the question regarding the CBR value of the embankment material? This will make a significant difference in the cost of the material to be used.  
Answer   Date:
 
 
Question Date: 3/18/2022 11:34:07 AM
Would the department answer the question regarding the CBR value of the embankment material? This will make a significant difference in the cost of the material to be used.  
Answer   Date: 3/18/2022 12:39:36 PM
The clarification has been provided.  
 
Subject: Soils Report Type: Other
Question Date: 3/17/2022 9:20:53 AM
Is there a soils report that can be posted for this project?  
Answer   Date: 3/17/2022 10:13:04 AM
The geotechnical report is available on CABB for viewing.  
 
Subject: Traffic Signal Timing Type: Plan
Question Date: 3/17/2022 8:56:58 AM
There is a note on sheet 1J that states, "Traffic signal timing along the detour route will be adjusted as needed to accommodate the additional traffic volume. The Contractor will monitor the traffic and make adjustment as needed." Since there is no signal scope or pay items on this project will the department consider making signal timing adjustments internally. It would be costly to include a signal sub in the bid for adjustments that are not clearly defined. Please reconsider this portion of the detour work.  
Answer   Date: 3/17/2022 10:04:10 AM
The city of Harrisonburg owns the signal infrastructure on the detour route. VDOT will work with the city to adjust signal timing internally as needed on the detour route.  
 
Subject: Pier Structural Excavation Backfill Type: Specifications
Question Date: 3/16/2022 5:30:12 PM
The roadway plans note that all excavated material is unsuitable. Can the excavated material from the center pier be used as backfill around the center pier foundation?  
Answer   Date: 3/17/2022 4:03:21 PM
If the material excavated for constructing the proposed pier is suitable, conforms to Section 303 of VDOT Road and Bridge Specifications, and is approved by the Engineer, the excavated material can be used to backfill around the pier.  
 
Subject: Structural Steel Type: Plan
Question Date: 3/14/2022 10:30:51 AM
Can you the department confirm that the structural bolts are not to be galvanized?  
Answer   Date: 3/14/2022 2:10:24 PM
High-strength structural bolts are not to be galvanized. They shall be ASTM A325, Type 3  
 
Subject: Hazardous Material Type: Plan
Question Date: 3/14/2022 10:29:55 AM
Would the department identify what material contains asbestos on the existing bridge?  
Answer   Date:
 
 
Subject: Structural Steel Erection Diagonal Bracing Type: Plan
Question Date: 3/11/2022 11:50:21 AM
On Sheet 13 of the bridge plans it is required to provide diagonal bracing at the abutments. Can the department clarify the purpose of this bracing and the extent the steel needs to be braced?  
Answer   Date: 3/15/2022 1:30:31 PM
The Contractor shall submit details of temporary bracing, as deemed necessary, as part of the Girder Erection Plan for the Department's review. The end diaphragms and cross-frames shown in the plans are permanent.  
 
Subject: Embankment Material Type: Plan
Question Date: 3/9/2022 4:29:11 PM
Sheet 2C(3) has a note on the bottom of the page indicating "Embankment material to meet requirements set for on Sheet 2 Note G6. Sheet 2 does not have a note G6, Can you clarify the requirements of the embankment material outside the 21B material required for a small portion of the project?  
Answer   Date: 3/18/2022 12:38:36 PM
All regular excavation, borrow excavation and embankment material used to construct embankments for this project shall meet a minimum CBR value of 5 as determined by VTM-8, shall not include USCS CH or MH soils unless stabilized with lime (per VTM-11) or cement (per VTM-72), shall be in accordance with Section 303.04(h) of the Road and Bridge Specifications or as approved by the District Materials Engineer.  
 
Subject: Fixed Completion Date Type: Proposal
Question Date: 3/9/2022 3:51:21 PM
When will the updated proposal be posted with the correct completion date? It is needed in order to obtain a bid bond.  
Answer   Date: 3/9/2022 4:29:19 PM
The revised proposal will be uploaded by COB Friday, 3/11/2022.  
 

Displaying questions 1 - 10 (of 17)