Subject: PLANS Type: Proposal
Question Date: 7/14/2026 10:34:17 AM
The proposal shows SM-12.5A under line number 70 and the detail on sheet 2a of the plans show SM-9.5A. Can you clarify which will be required?  
Answer   Date: 7/16/2026 6:05:06 PM
SM-9.5A is correct as shown in the plans. Item will be changed in upcoming addendum.  
 
Subject: Geotechnical Report Type: Other
Question Date: 7/6/2026 7:44:21 PM
Please provide geotechnical report as it was not included in projectwise.  
Answer   Date: 7/9/2026 9:01:06 AM
There is not a geotechnical report. The contractor is responsible for investigation of the signal poles as per the Road and Bridge Specifications.  
 