A63
119468
1947-080-952, M501
7/17/2026
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
12" Water Line
Type:
Plan
Question
Date:
7/16/2026 1:36:18 PM
Plan Sheet 11(3) shows 8 LF of 12" water line replacement behind the curb line and a 12" Gate valve and manhole in the roadway. Can the 12" Gate valve be installed in the same location as the 8 L.F. of 12" Water Main ( behind the existing curb line)?
Answer
Date:
7/17/2026 1:21:54 PM
The Western Virginia Water Authority (WVWA) requested that the valve be placed in that location. It would certainly be easier to locate the valve in the section where the waterline is being replaced. However, that places the valve (and manhole) in the ADA ramp or in the sidewalk at a location where we’re not certain the manhole frame and cover would fit entirely in the sidewalk. It may be possible to work this out in the field with WVWA, but the contractor should bid this as shown.
Subject:
Comcrete Class A Misc.
Type:
Bid Sheet
Question
Date:
7/15/2026 10:15:30 AM
The bid proposal includes 39.1 CY CY of Misc. Concrete. The drainage summary sheet 3B shows19.55 CY. Where is the remaining 19,55 CY?
Answer
Date:
7/15/2026 11:47:04 AM
Please bid the project as advertised in accordance with the bid documents.
Question
Date:
7/16/2026 1:29:12 PM
How do we bid on 20 CY of Misc. Concrete when we do not know what work is involved?
Answer
Date:
7/17/2026 10:45:36 AM
Sheet 2B(1) lists the sub quantities under Concrete Class A3 Misc. and each sub quantity has the item listed to the right of the table.
Subject:
Temporary Shoring
Type:
Plan
Question
Date:
7/14/2026 3:29:51 PM
How does the Department intend to pay for the temporary shoring shown on Plan Seet 1H(4) that is needed for the installation of storm drain 4-7 to 4-6?
Answer
Date:
7/15/2026 10:23:20 AM
Please bid the project as advertised in accordance with the bid documents.
Subject:
Microstation Foilder
Type:
Plan
Question
Date:
7/14/2026 7:20:39 AM
The Microstation Folder in Bentley is empty. Can you provide access to the Microstation files?
Answer
Date:
7/14/2026 11:15:59 AM
These files are now available.
Subject:
Bid Items
Type:
Bid Sheet
Question
Date:
7/13/2026 9:26:07 AM
The bid proposal includes a bid item for Embankment and a bid item for Borrow Excavation. To which work item(s) does embankment apply?
Answer
Date:
7/13/2026 10:31:22 AM
Construction of the SWM facility.
Subject:
Geotechnical Information
Type:
Other
Question
Date:
7/13/2026 9:16:10 AM
can you post the geotechnical report for this project?
Answer
Date:
7/13/2026 12:32:17 PM
The report has been uploaded.
Subject:
Clearing TOYR
Type:
Proposal
Question
Date:
6/23/2026 2:55:42 PM
The project proposal included a clearing TOYR with no clearing between 4/1 and 11/15. The project bids in July and would say begin in September. What is the Department's plan for clearing with the project having a couple of months from potentially starting and the ability to clear for Phase I in mid-November?
Answer
Date:
6/24/2026 11:02:56 AM
The Department is aware of the TOY restriction on tree clearing and has accounted for this when determining Contract Fixed Completion Date. From the Department’s position, there was no reason to delay the advertisement or NTP and that the contractor could use the 1 to 2 months for submittals and reviews, lots of drainage items to procure, etc...
Subject:
Grading Diagram / Summary
Type:
Plan
Question
Date:
6/23/2026 2:49:29 PM
The plans appear to be missing a grading diagram / summary. Can this be provided?
Answer
Date:
6/24/2026 11:03:19 AM
This is a Minimum Plan Project and a Grading Diagram is not required. Please see the Cross – Sections.
Displaying questions 1 - 8 (of 8)
Page: