Subject:
Wage Rate - Electrician
Type:
Specifications
Question
Date:
4/14/2026 8:47:33 AM
The provided wage rates do not address electrical work necessary for the park and ride lighting. Please provide rate(s).
Answer
Date:
4/14/2026 10:05:20 AM
If a required classification is not included in the wage determination, the process is as follows: After award, contact the project’s District Civil Rights team—in this case, the Staunton District—to identify any missing classifications that require rates. The District will assist you in completing the C-51 form to propose rates and request approval from the Department of Labor for those classifications. For your convenience, Staunton Districts Civil Rights email: StauntEO@vdot.virginia.gov
Subject:
Grading
Type:
Other
Question
Date:
4/10/2026 11:11:08 AM
Due to limited boring information and rock being present in the region, how will rock excavation be paid for if encountered?
Answer
Date:
4/13/2026 11:05:13 AM
Rock excavation will be paid with Lump Sum grading proposal line #0110.
Question
Date:
4/10/2026 11:09:59 AM
Due to unsuitable materials anticipated onsite how will undercut excavation and replacement of undercut be paid for?
Answer
Date:
4/13/2026 11:05:39 AM
All excavation will be paid with Lump Sum grading #0110. Replacement of materials will be paid for with item Borrow proposal line #0120.
Subject:
Grading
Type:
Proposal
Question
Date:
4/10/2026 11:09:21 AM
Per note G-6 on sheet 02 all site cut materials appear to be unsuitable. Please confirm that all site cut/export materials should go to proposal line #0110?
Answer
Date:
4/13/2026 11:05:58 AM
All excavation will be paid with Lump Sum grading #0110.
Subject:
Asphalt Milling
Type:
Specifications
Question
Date:
4/10/2026 11:08:02 AM
Borings in existing asphalt parking lot differ in depth. Can a baseline for existing asphalt depth in parking lot be established?
Answer
Date:
4/13/2026 11:07:01 AM
The boring information is from the Final Soil and Minor Structure Report. The department can not state anything other than what is shown in the Report.
Subject:
BM-25.0
Type:
Bid Sheet
Question
Date:
4/1/2026 7:29:21 AM
The only BM-25.0 on the project that we can find is for the patch of Oranda road for the pipe crossing. Asphalt patching of pipe trenches is typically incidental to the storm drainage. Can you please confirm this is the asphalt in the pay items and it shall be compensated at the tonnage required or is this pay item for another scope?
Answer
Date:
4/1/2026 2:03:36 PM
BM-25.0 bid item is for temporary patching of trenches for utility and pipe crossings. Reference note 13 on plan sheet 1K. Temporary patches shall consist of Asphalt Concrete Base Course BM-25.0 at a minimum depth of four inches.
Subject:
SVEC - Relocation
Type:
Other
Question
Date:
3/20/2026 8:46:18 AM
It appears there is stakeout onsite for a SVEC relocation for a new pole and brace pole adjacent to the power service location. Please confirm all utility costs associated with hookup fees, design, engineering, relocation due directly to the utility company are not the responsibility of the contractor. Also, there is a bid item for removal of existing lighting, however it is our understanding this is typically performed by the utility company, as the existing is their poles/equipment not VDOT's. Please confirm this is correct and no costs due to SVEC for removal are required for this removal scope either.
Answer
Date:
3/20/2026 10:37:55 AM
The costs associated with hookup fees, design, engineering, relocation due directly to the utility company will not be the responsibility of the contractor. The bid item for Remove Existing Parking Lot Lighting System is for the existing light poles, which are VDOT assets. There are no costs due to SVEC removal with this scope.
Subject:
Schedule/TOYR
Type:
Permits
Question
Date:
3/16/2026 10:07:16 AM
Per Section 103.02 the award of the contract could be as late as 75 days from the opening of bids, which would be 7/6/26. There is a TOYR on clearing from 5/15/26 until 7/31/26 limiting the ability to start the project until 8/1/26, since the first phase of construction requires clearing almost immediately. Was this schedule considered when selecting a completion date of 11/20/26?
Answer
Date:
3/18/2026 9:10:45 AM
There is significant work that can be accomplished prior to the clearing of trees on August 1st. However, the fixed completion date will change to 01/08/2027 to account for procurement of the overhead lighting materials. A Substantial Completion date of 11/20/2026 will be added to include all other work outside of the overhead lighting. Addendum to follow.
Displaying questions 1 - 7 (of 7)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
4/26/2026 5:45:27 AM
2008