Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
568
127805
PM5Q-046-F26, P401
1/30/2026
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
AGR.BASE MAT.TY.I OR II NO. 21A OR 21B
Type:
Proposal
Question
Date:
1/30/2026 2:29:00 PM
Rte. 711 has 677 Tons of Agr. Base Mat. Ty. I OR II 21A or 21B . Could the department please detail a little more on the intent for this material? Grace Street has 80 tons for the replacement of unsuitable material. Is this 677 tons to be used as replacement for unsuitable or shoulder stone for the entire project or something totally different?
Answer
Date:
2/2/2026 9:10:26 AM
The Agr. Base Mat. Ty. I OR II 21A or 21B is to be used as needed to replace any unsuitable material encountered in the field.
Subject:
Asphalt Indice Price
Type:
Proposal
Question
Date:
1/28/2026 4:21:10 PM
With the bid letting being delayed from 1/28/26 to 2/4/26, are Contractors supposed to use the January or February Asphalt Indice Price?
Answer
Date:
1/28/2026 4:41:36 PM
The Base Index and base index price for this contract will be those published on the Construction Division website for the month of January. An addendum will be posted by noon 1.29.2026 to add the spcn accordingly.
Subject:
Plan
Type:
Plan
Question
Date:
1/21/2026 10:44:53 AM
Is the curb and gutter just an allowance for replacing broken curb or is there specific area there will be curb and gutter replacement. Thank you
Answer
Date:
1/21/2026 3:00:22 PM
The contractor is responsible for preserving and protecting existing curb and gutter. Any damages to the curb and gutter caused by the Contractor’s operations will be the responsibility of the Contractor to be repaired at no cost to the Department. The Curb and Gutter line item is to be used as needed at the direction of the Engineer.
Question
Date:
1/21/2026 10:33:45 AM
What manhole/utility demo plan is the department referring to? It looks like we are to just adjust existing utilities.
Answer
Date:
1/21/2026 3:02:28 PM
The manhole/utility demo plan shall clearly define the proposed method for performing resurfacing work around existing utility structures and procedures for demolition and reconstruction of manholes, if required.
Question
Date:
1/21/2026 10:27:56 AM
Extensive potholing will need to be performed on Grace Street. Is this cost to be incidental to all other construction items?
Answer
Date:
1/21/2026 2:58:19 PM
Yes, potholing will be incidental to appropriate bid items.
Subject:
Trench Milling
Type:
Bid Sheet
Question
Date:
1/21/2026 10:14:52 AM
Is the trench milling along curb and gutter going to be paid for as "removal up to 12" of material"?
Answer
Date:
1/21/2026 3:01:47 PM
Trench milling along curb and gutter is incidental to appropriate bid items.
Subject:
Survey files
Type:
Plan
Question
Date:
1/6/2026 7:42:14 AM
This is an advisory Q/A from the Department, to advise the bidders of publishing survey .dgn files to supplement the Proposal.
Answer
Date:
1/6/2026 7:42:37 AM
The survey files are now published.
Displaying questions 1 - 5 (of 5)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
3/11/2026 7:45:32 AM
2008