Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
N09 119460 0460-009-883, C501 9/19/2025
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Detection zone distance using a single fisheye camera Type: Plan
Question Date: 9/19/2025 4:26:02 PM
The maximum recommended distance for a safety analytics system from a single fisheye camera is 250'. Plan note #4 on sheet 11(3) calls for a zone that extends 500' on either side of the camera. Will a 250' max distance be allowed? The 250' distance will provide adequate coverage to conduct the near miss analysis.  
Answer   Date:
 
 
Subject: Underground Utilities Type: Plan
Question Date: 9/18/2025 10:48:45 AM
Plan sheet 1H shows several utility adjustments required for the project. Have these been completed at this time? If not, are they the responsibility of the contractor?  
Answer   Date: 9/18/2025 12:19:23 PM
Water line relocations, to be performed by the contractor, are detailed in Sheet 10(01) to 10(07). Other utilities in conflict have already been relocated prior to construction.  
 
Subject: Length of cellular service Type: Specifications
Question Date: 9/12/2025 11:33:42 AM
Please confirm the cellular service is to be for 3 years for the near miss detection system and is to be included in the lump sum price.  
Answer   Date: 9/15/2025 9:02:10 AM
There is a separate pay item for cellular/PCS wireless modem, which includes 1 year of leased wireless services as part of that pay item (per R&B Spec 807).  
 

Displaying questions 1 - 3 (of 3)
Page: 1 First Previous Next Last