Project Info
Order Number UPC State Project Number Last Date to Post Questions
M72 119164 0311-071-835, C501 7/18/2025
Search Questions
Search
Question Type  
    Export Q&A    
Question List
Subject: Tack Coat Type: Proposal
Question Date: 7/7/2025 10:47:21 AM
Can a bid item for tack coat be added since there is so many different areas that will require tack and several lifts of asphalt that will require tack coat for this project.  
Answer   Date:
 
 
Subject: Existing Bridge Type: Plan
Question Date: 6/30/2025 11:29:12 AM
Culvert Concrete quantities on plan sheet 2K(1) appear to be overstated. Please review.  
Answer   Date: 7/1/2025 9:44:02 AM
The quantities for items 302SD20-0004 CONCRETE CLASS A4 BOX CULVERT and 302SD20-0005 REINF. STEEL will be corrected in a forthcoming addendum.  
 
Subject: Asphalt Item Type: Plan
Question Date: 6/13/2025 1:08:18 PM
Plans call for BM-25.0A on sheets 2A - 2A(3) and 2B(1) but the Schedule of Items includes only BM-25.0, please confirm which is correct.  
Answer   Date: 6/13/2025 1:11:12 PM
The Schedule of Items is correct. Plan sheets 2A(0) – 2A(3) and 2B(1) will be revised via forthcoming addendum.  
 
Subject: Sod Type: Plan
Question Date: 6/13/2025 1:07:32 PM
SOD is included on the Schedule of Items but is not listed on sheet 2G(13). Will sod be required?  
Answer   Date: 6/13/2025 1:10:53 PM
Sod is required and sheet 2G(13) will be revised via forthcoming addendum.  
 
Subject: Topsoil Type: Plan
Question Date: 6/13/2025 1:06:51 PM
Topsoil on plan sheet 2C is Type A while Topsoil on the Schedule of Items has it is listed as Type B. Please confirm which is correct.  
Answer   Date: 6/13/2025 1:10:28 PM
Topsoil Type B is correct. Plan sheet 2C will be revised via forthcoming addendum.  
 
Subject: Asphalt Concrete Type SM-12.5D Constr Type: Proposal
Question Date: 6/12/2025 12:55:51 PM
Can BMD P+VO SM-12.5D be used in place of SM-12.5D?  
Answer   Date: 6/13/2025 11:47:36 AM
Please bid according to the bid proposal documents. After contract award, the successful low bidder may submit a request for substitution for the Department’s review. Any approved substitution will be at no additional cost to the Department.  
 
Subject: Grading Summary Type: Plan
Question Date: 5/22/2025 9:10:22 AM
Sheet 2B(2), Grading Summary shows both Total Regular Excavation and Borrow as paid by plan quantities. The Borrow designation as plan quantity seems odd. With plan quantity for both Reg Ex and Borrow the Department is essentially making the project a LUMP SUM Grading job. Is that the intent or is Borrow miss labeled?  
Answer   Date: 5/27/2025 3:36:28 PM
An addendum is forthcoming to remove the plan quantity designation for borrow excavation.  
 
Subject: Undercut Backfill Type: Plan
Question Date: 5/22/2025 9:07:21 AM
Plan Sheet 2A(4), note #3 "...where water is encountered, we recommend backfill consist of 8in No. 57 stone wrapped in geotextile..." When No. 57s are used in accordance with this note how are the No. 57s to be paid for? There only appears to be a Select Material CBR 30 pay item but not one for the No. 57.  
Answer   Date: 5/27/2025 3:37:02 PM
Where water is encountered, No. 57 stone and geotextile fabric used for backfill will be measured and paid for at the contract unit prices for 302SD20-0002 and 504SD20-0005, respectively.  
 

Displaying questions 1 - 8 (of 8)