Question List
Subject: Ditches Type: Proposal
Question Date: 3/17/2025 9:49:05 AM
It appears that there are areas where the existing shoulder is minimal. In the case where the aggregate placement on the shoulder creates a slope/wedge to existing ditch greater than 2:1 slope, will the centerline of ditch need to be adjusted away from the roadway? In this case, an item for clearing and grubbing would need to be included in the contract  
Answer   Date: 3/17/2025 10:57:08 AM
The proposed typical sections, sheet TS-4 and TS-5 require a 2:1 MAX slope in areas of fill or tie above existing ditch invert in areas of cut. The typical sections do not propose adjusting the existing ditch inverts away from the road.  
 