Subject:
Ditches
Type:
Proposal
Question
Date:
3/17/2025 9:49:05 AM
It appears that there are areas where the existing shoulder is minimal. In the case where the aggregate placement on the shoulder creates a slope/wedge to existing ditch greater than 2:1 slope, will the centerline of ditch need to be adjusted away from the roadway? In this case, an item for clearing and grubbing would need to be included in the contract
Answer
Date:
3/17/2025 10:57:08 AM
The proposed typical sections, sheet TS-4 and TS-5 require a 2:1 MAX slope in areas of fill or tie above existing ditch invert in areas of cut. The typical sections do not propose adjusting the existing ditch inverts away from the road.
Displaying questions 1 - 1 (of 1)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
3/21/2025 7:36:57 AM
2008