Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
K89
122869
0460-962-829, N501
4/18/2025
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Export Q&A
Question List
Subject:
GEOGRID REINFORCEMENT/GUARDRAIL POST INSTALLATION
Type:
Plan
Question
Date:
3/12/2025 5:57:09 PM
Page 247 details that guardrail posts ae to be installed through the geogrid reinforcement. Is it safe to assume that steel guardrail posts can be mechanically driven through the geogrid?
Answer
Date:
3/13/2025 7:39:10 AM
Yes, the Geogrid will present little to no additional resistance to post driving operations.
Subject:
Quantities Discrepancies
Type:
Bid Sheet
Question
Date:
3/12/2025 4:32:52 PM
1. Does the Schedule of Items (SOI) supersede all quantities in the Quantities Summary(s) and Individual Site # quantities? 2. If the answer to number 1 above is “No”, quantities on the SOI, Quantities Summary(s), and Individual Site # Quantities have discrepancies for the following Line Numbers: a. 0080 b. 0110 c. 0150 d. 0200 e. 0210 f. 0220 g. 0230 h. 0260 i. 0280 j. 0300 k. 0320 l. 0510 m. 0520 Please provide clarification on the approximate quantities and units for the above Proposal Line Numbers listed.
Answer
Date:
3/14/2025 1:25:59 PM
The Schedule of Items and Quantity Summaries for Items 0080, 0510, and 0520 are correct and in agreement. The Schedule of Items and/or Quantity Summaries for Items 0110, 0150, 0200, 0210, 0220, 0230, 0260, 0280, 0300, and 0320 all had inconsistencies. An addendum is forthcoming.
Question
Date:
3/19/2025 11:28:46 AM
There are clear discrepancies on the addendum revised on 03/14/2025 between the Schedule of Items vs. the Quantity Summaries for the following Line Numbers: 0210 - shows 31 on SOI vs. 36 from Quantity Summaries (21 + 15); 0220 - shows 14550 (SOI) vs. 14560 (QS); 0230 - shows 24,775 (SOI) vs. 24782 (QS); 0280 - shows 27041 (SOI) vs. 26716 (QS). Please advise if SOI takes precedence over the Quantity Summaries and not just individual GR Site Summary.
Answer
Date:
3/20/2025 3:30:49 PM
Receipt of bids is being delayed and another addendum is forthcoming.
Question
Date:
3/17/2025 3:06:55 PM
In the addendum, the following line numbers for the SOIs, Summaries of Estimated Quantities, and Individual Site # Quantities are inconsistent with each other: 0080 (not included in any of the individual Site # Quantities), 0210 (Summaries Quantities differs), 0220 (Summaries Quantities Differs), 0230 (Summaries Quantities differs), 0280 (Summaries Quantities differs), 0300 (not included in any of the Individual Site # quantities). Please advise.
Answer
Date:
3/18/2025 4:03:23 PM
There are no apparent discrepancies between the Schedule of Items vs. the Quantity Summaries. If any discrepancies are present in the individual GR Site Summary of Estimated Quantities, the Schedule of Items shall take precedence.
Subject:
Typical Section Clarification
Type:
Plan
Question
Date:
3/11/2025 12:25:43 PM
On the Montgomery section of the project, can you please clarify what station ranges are to receive the 4" Mill and Replace and which station ranges are to receive the 8' Full Depth Trenching? The dashed lines drawn on the plans to denote the different types of work do not seem to match the lines shown on the legend for these two items.
Answer
Date:
3/14/2025 2:14:31 PM
8’ Full Depth Trenching is no longer a part of the project and that linestyle has been removed from the legend in the revised plans as part of a forthcoming addendum. The 8’ Full Depth Trenching linestyle does not appear anywhere in the current plan sheets. The linestyle for 4” Mill and Replace (Match Exist.) did not plot correctly in the plan view and looked very similar to the 10’ Full Depth Trenching linestyle. This will also be corrected in the forthcoming addendum.
Question
Date:
3/19/2025 4:29:49 PM
The plans provided in the March 14 revision still show 8' Full Depth Trenching on the legend and the linestyle for the 4" Mill and Replace still does not match the linestyle shown in the legend. Was this the addendum to correct those issues or is there another forthcoming? Can you please provide clarification on all locations that 4" Mill and Replace is to take place?
Answer
Date:
3/20/2025 3:30:30 PM
Receipt of bids is being delayed and an addendum is forthcoming.
Displaying questions 1 - 3 (of 3)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
3/21/2025 7:03:46 AM
2008