Question List
Subject:
time restrictions
Type:
Proposal
Question
Date:
3/20/2025 1:38:25 PM
According to the TMP daytime hours Route 220 north bound will be restricted to 5 1/2 hr lane closure 10am-330pm Route 220 south bound will be restricted to 4 hr lane closure 9 am -1 pm How much production can be expected with lane closure setup, equipment mobilization from clear zone to work area, milling, three lifts of asphalt (6" of base has to be placed in two lifts, compacted and cooled enough for subsequent lift placement then sm asphalt placed, compacted, and cooled before exposure to traffic and equipment demobilization and removal of lane closure? Not A lot. Again, for a bid to be developed (with the need to limit repeated exposure to the traveling public and taxpayer money expenditures in mind) What will allowable night work hours be on route 220 north and south bound?
Answer
Date:
Question
Date:
3/20/2025 10:55:51 AM
what will allowable hours for night work on 220 and 460 be?
Answer
Date:
3/20/2025 12:40:13 PM
The TMP Allowable Work Hours section for all routes states “Night or weekend work shall be approved by the engineer prior to commencement of work. Allowable night/weekend hours will be reviewed at the time of the request.” Allowable night work and hours could vary based on the route, location along the route, and other factors, therefore these will need to be reviewed on a case-by-case basis.
Subject:
Allowable Workhours
Type:
Specifications
Question
Date:
3/18/2025 1:22:30 PM
Route 220 is deemed to be preformed from tthe hours of 9:00AM-3:30PM. However the state wont allow for lane closures on the Northbound section from 6:00AM-10AM and on the Southbound section no lane closures from 1PM-6PM. Can you confirm that the allowable work hours on the Northbound Section are 10AM-3:30PM and the Southbound section is from 9AM-1PM?
Answer
Date:
3/18/2025 4:27:48 PM
The Allowable Work Hours on Route 220 are 9am to 3:30pm. Work may be performed within the Allowable Work Hours and outside of the listed Temporary Lane Closure Restrictions such that it can be performed without closing a lane.
Subject:
bidders list
Type:
Other
Question
Date:
2/13/2025 2:07:01 PM
how do I find the bidders list for this project? I cannot find it when I click on Plan section, and nothing is listed for bidders
Answer
Date:
2/13/2025 2:26:02 PM
The Plan Holders List is posted. Please click on "PROP" under E-PLANS.
Question
Date:
2/18/2025 10:23:25 AM
I am signed in. I click on PROP. It goes to Bentley Projectwise webview, with https://connect-projectwisewebview.bentley.com/?link=QmVudGxleS5QVy0tdmRvdC1wdy5iZW50bGV5LmNvbX4zQVBXLzIxNTUxMi9zYXZlZC1zZWFyY2g
Answer
Date:
2/18/2025 10:27:56 AM
Please follow the directions on the following website to gain access to VDOT files on ProjectWise. https://www.vdot.virginia.gov/doing-business/tools/projectwise/
Question
Date:
2/18/2025 9:25:33 AM
When I click on PROP this pops up https://connect-projectwisewebview.bentley.com/?link=QmVudGxleS5QVy0tdmRvdC1wdy5iZW50bGV5LmNvbX4zQVBXLzIxNjAwMy9zYXZlZC1zZWFyY2g. It goes to bentley and says there is no files
Answer
Date:
2/18/2025 10:28:16 AM
Please follow the directions on the following website to gain access to VDOT files on ProjectWise. https://www.vdot.virginia.gov/doing-business/tools/projectwise/
Subject:
Typical Sections
Type:
Specifications
Question
Date:
1/23/2025 11:37:15 AM
The typical Sections show saw cut full depth for trench widening activities. Would milling supplement the saw cut?
Answer
Date:
3/17/2025 2:14:19 PM
Full Depth Saw Cut has been removed as part of recent addendum. The trenching pay items ASPH. CONC. TY. IM-19.0D T MAINT and ASPH. CONC. TY. BM-25.0 T MAINT will cover trench widening as described in the proposal.
Subject:
Letting
Type:
Bid Sheet
Question
Date:
1/22/2025 7:32:08 AM
Will receipt of bids for this project be delayed?
Answer
Date:
1/22/2025 7:34:06 AM
Yes, receipt of bids for this project will be delayed. Notification is forthcoming.
Displaying questions 1 - 5 (of 5)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
3/21/2025 6:49:45 AM
2008