Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
663
125796
PM6Z-088-F25,P401
1/17/2025
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Type:
Proposal
Question
Date:
1/16/2025 10:01:11 AM
Page 255 of the proposal states that removed material is approximated at 3 ft wide and 14inches in depth on each side. Is this statement meant to be a requirement for the removal area, meaning all removal takes place in the outer 3 ft edge of roadway at a 14" depth? Or can the needed material be removed from the entire lane width before, during or after performing the FDR operations? Thanks.
Answer
Date:
1/16/2025 11:33:18 AM
Excavation at 3-ft width by 14-in depth each side is not a requirement. Material may be removed from the entire lane width before, during, or after performing the FDR operation.
Question
Date:
1/14/2025 1:35:37 PM
The specifications state a mix design for the FDR has already been done. Can you please provide a copy of mix design for bidding purposes?
Answer
Date:
1/14/2025 1:58:21 PM
An addendum is forthcoming to add the mix design.
Displaying questions 1 - 1 (of 1)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
1/23/2025 2:19:20 AM
2008