Subject: Type: Proposal
Question Date: 1/16/2025 10:01:11 AM
Page 255 of the proposal states that removed material is approximated at 3 ft wide and 14inches in depth on each side. Is this statement meant to be a requirement for the removal area, meaning all removal takes place in the outer 3 ft edge of roadway at a 14" depth? Or can the needed material be removed from the entire lane width before, during or after performing the FDR operations? Thanks.  
Answer   Date: 1/16/2025 11:33:18 AM
Excavation at 3-ft width by 14-in depth each side is not a requirement.  Material may be removed from the entire lane width before, during, or after performing the FDR operation.  
 
Question Date: 1/14/2025 1:35:37 PM
The specifications state a mix design for the FDR has already been done. Can you please provide a copy of mix design for bidding purposes?  
Answer   Date: 1/14/2025 1:58:21 PM
An addendum is forthcoming to add the mix design.  
 