Order Number
UPC
State Project Number
Last Date to Post Questions
L23
107141
0620-088-R73,C501
6/21/2024
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Contaminated Soils
Type:
Other
Question
Date:
6/21/2024 4:25:52 PM
If we encounter contaminated soils during the excavation process, how will the contractor be compensated?
Answer
Date:
6/25/2024 9:20:37 AM
Please refer to the VDOT Road and Bridge Specifications Section 104.03 – Differing Site Conditions
Subject:
Rock During Excavation
Type:
Other
Question
Date:
6/21/2024 4:25:06 PM
If we encounter rock during the excavation process, how will the contractor be compensated?
Answer
Date:
6/25/2024 9:20:58 AM
Please refer to the VDOT Road and Bridge Specifications Section 104.03 – Differing Site Conditions.
Subject:
Parcels
Type:
Other
Question
Date:
6/21/2024 4:24:13 PM
Please confirm that the contractor doesn’t need to demolish any of existing buildings of the different parcels other than the described scope of the bid item.
Answer
1 previous answer(s)
Date:
6/25/2024 10:26:18 AM
Refer to sheet 2H(2) for the Building Data Summary. Well on Parcel 003 is labeled Do Not Disturb. Reference to this well will need to be removed from sheet 2H(2) and schedule of Items via field change order after award. Bid document as presented.
Subject:
Wells
Type:
Other
Question
Date:
6/21/2024 4:23:01 PM
Please provide further information such as location and size of the wells to demolish in the different parcels of bid items demo of bldg. parcels 001, 003 and 014 – Wells.
Answer
1 previous answer(s)
Date:
6/25/2024 10:25:25 AM
The Well D2 on Parcel 001 is not known and will need to be verified by the contractor. The Well D3 on Parcel 014 is labeled 36” on sheet 6. The Contractor can obtain additional information from the Spotsylvania County Health Department. Well on Parcel 003 is labeled Do Not Disturb. Reference to this well will need to be removed from sheet 2H(2) and schedule of Items via field change order after award. Bid document as presented.
Subject:
Boirrow Excavation
Type:
Other
Question
Date:
6/21/2024 4:22:22 PM
Please clarify what is included in the borrow excavation bid item.
Answer
Date:
6/25/2024 9:22:21 AM
Please refer to the VDOT Road and Bridge Specifications Section 303 – Earthwork.
Subject:
Material
Type:
Other
Question
Date:
6/21/2024 4:21:47 PM
Please clarify the type of material to use to replace the unsuitable material and how that material will be measured and paid.
Answer
Date:
6/25/2024 9:22:54 AM
Refer to Typical section sheets 2A(1) - 2A(3) - and Geotechnical Engineering Report for undercut being backfilled with Aggregate Base Material Type I, No.21B.
Subject:
Formula
Type:
Plan
Question
Date:
6/21/2024 4:21:21 PM
Please confirm that the formula shown on plan 2G Grading summary for Total Fill (N)=J+E+G+H+L+R is correct? It seems that is not factoring the H quantities.
Answer
Date:
6/25/2024 9:23:18 AM
Refer to Typical section sheets 2A(1) - 2A(3) - and Geotechnical Engineering Report for undercut being backfilled with Aggregate Base Material Type I, No.21B.
Subject:
LUP Permit
Type:
Permits
Question
Date:
6/21/2024 4:20:42 PM
Is an LUP Permit required? If so, can you provide a budget cost for the LUP Estimate so we may factor in the bond cost?
Answer
Date:
6/25/2024 9:23:46 AM
A Land Use Permit is not required.
Subject:
Website/Documentation
Type:
Other
Question
Date:
6/21/2024 4:19:35 PM
Can you provide a website or documentation showing actual existing utilities?
Answer
Date:
6/25/2024 9:24:08 AM
Please refer to the VDOT Road and Bridge Specifications, Section 102.04 (d) Utilities.
Subject:
Geotechnical Report/Information
Type:
Other
Question
Date:
6/21/2024 4:18:58 PM
When actual conditions are different from the geotechnical report/information provided, will the contractor be entitled for additional compensation?
Answer
Date:
6/25/2024 9:24:35 AM
Please refer to the VDOT Road and Bridge Specifications Section 104.03 – Differing Site Conditions.
Displaying questions 1 - 10 (of 19)
Page:
1
2
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
1/23/2025 2:44:20 AM
2008