Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
L20
112880
0707-056-735, B650, B699
6/21/2024
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Bid Items
Type:
Proposal
Question
Date:
6/18/2024 9:01:26 AM
The bid item for CL. II Riprap 38" is listed in the proposal as a pay item per square yard. It is listed on bridge plan sheet 2 to be paid by the ton. Which is correct?
Answer
Date:
6/18/2024 10:33:14 AM
The plan summary is correct. It should be 773 Tons. Addendum is forthcoming.
Question
Date:
6/17/2024 2:54:19 PM
In front of Abutment A on structure # 6003 there is a signifcant amount of material to be excavated in front of the existing abutment. Is this material to be included in the structure excavation or regular excavation?
Answer
Date:
6/18/2024 7:47:12 AM
Excavation outside the limits of structure excavation is considered regular excavation. The limits of structure excavation are defined in the detail on sheet 5 of 29.
Subject:
Bid Items
Type:
Plan
Question
Date:
6/17/2024 2:47:21 PM
How is the removal of the diversion to be paid?
Answer
Date:
6/17/2024 3:18:16 PM
Please see General Note #2 on sheet 29f on the removal of the diversion.
Question
Date:
6/17/2024 2:46:04 PM
How is the material, Cl. I Riprap and VDOT #1 to be paid for the temporary creek crossing of the diversion? There are no pay items associated with area of work.
Answer
Date:
6/18/2024 12:00:06 PM
Cl. I Riprap and VDOT #1 are not required. Note #1 on sheet 29m is incorrect and will be deleted via a forthcoming addendum. The Triple 48” CMP shall be in accordance with Section 302 of the Specifications per plan revision dated 6/18/24. Riding surface shall be Aggregate Base Material, Type 1, No. 21B per Temporary Road Typical Section on sheet 29g. Earthwork has already been included in the grading summary.
Subject:
Bridge Posting
Type:
Other
Question
Date:
6/11/2024 2:13:56 PM
The posted capacity of 16 tons appears to be for structure 6053, please confirm. Is structure 6003 unposted; meaning it is safe for Virginia legal loads?
Answer
Date:
6/11/2024 3:44:54 PM
Currently structure 6003 is not posted for restricted weights.
Subject:
Pile Base Plates
Type:
Plan
Question
Date:
6/11/2024 1:06:39 PM
What grade steel will the department require for the piling base plates?
Answer
Date:
6/11/2024 1:59:45 PM
The plate is a part of the pile and should be Grade 50 as required for the pile.
Subject:
Plans
Type:
Plan
Question
Date:
6/6/2024 8:20:01 AM
Are there existing bridge plans available?
Answer
Date:
6/6/2024 11:29:04 AM
There are no original plans for Structure 6053. Structure 6003 has a partial set of copies, it appears the complete original set has been lost or mistakenly destroyed. This partial set has now been posted.
Subject:
Sequence of Construction
Type:
Plan
Question
Date:
6/5/2024 9:57:42 AM
Due to the short time frame alloted for this project, espcially considering B650 is phased, will the department allow both bridges to be under construction at the same time. Can traffic be using the diversion and in the one lane condition on B650?
Answer
Date:
6/5/2024 10:38:43 AM
VDOT would be open to this proposal from the successful Contractor contingent on approval of the plan of operations and sequence of construction. Utilization of the diversion and one lane condition on B650 should not present a problem considering the low volume of traffic however this would still need to be presented by the successful Contractor for approval.
Displaying questions 1 - 6 (of 6)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
12/11/2024 11:46:42 AM
2008