Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
H80 15955 0001-127-108,C501 3/22/2024
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Bid Item 570 Install Signs 25 LF Type: Specifications
Question Date: 3/25/2024 9:38:50 AM
Should this pay item be paid for by Each? The signal Summary has an install sign OF 25 EA.  
Answer   Date:
 
 
Subject: PEDESTRIAN SIGNAL HEAD SP-9 or SP-8 Type: Specifications
Question Date: 3/20/2024 1:58:02 PM
Line items calls for SP-9. Is this correct? I was advised that Richmond uses SP-8. Please advise.  
Answer   1 previous answer(s) Date: 3/21/2024 8:16:33 AM
The City of Richmond utilizes the SP-8 signal head. That being said, please bid the project as shown in the bid documents; the SP-9 signal head. The intent will be to issue a change order during construction to add the SP-8 and remove the SP-9.  
 
Subject: Plan Holders Type: Plan
Question Date: 3/13/2024 1:55:58 PM
Can you post the Plan Holders List?  
Answer   Date: 3/13/2024 3:02:47 PM
Plan Holders List has now been posted.  
 
Question Date: 3/18/2024 12:56:43 PM
Will the Engineer be able to allow the clearing of the lay down area prior to November 15th bat restriction date?  
Answer   Date: 3/21/2024 9:05:53 AM
All tree clearing needs to be in compliance with the TOYR.  
 
Subject: Plans Available Type: Plan
Question Date: 2/28/2024 8:58:25 AM
Are there plans available for this project?  
Answer   Date: 2/28/2024 9:11:11 AM
Yes, plans and proposal are available in ProjectWise.  
 
Question Date: 3/18/2024 9:35:38 AM
Are there any geotechnical borings or reports available for this project that can be added to project wise?  
Answer   Date: 3/19/2024 8:29:11 AM
The Soil Survey Report has been posted and is for informational purposes only.  
 
Question Date: 3/11/2024 1:46:17 PM
Can the Department provide the flow rates for the existing Sanitary Sewers at the proposed locations of modifications?  
Answer   Date: 3/12/2024 11:02:25 AM
The Department does not have the flowrate on the sanitary sewer. The intended sewer relocation design uses doghouse manholes to be able to construct the new sewer while the existing sewer flows are maintained to prevent the need for bypass pumping.  
 

Displaying questions 1 - 4 (of 4)