Subject: Depth Asphalt Type: Proposal
Question Date: 1/5/2024 11:17:06 AM
On page 238 of the proposal Route 58 WB milepost 7.15 to Milepost 9.14 BMD-P+VO SM-12.5D states that depth of asphalt is 1.5" deep however lbs/SqYd is 230. Is depth suppose to be 2"?  
Answer   Date: 1/5/2024 1:21:12 PM
The depth should be 2". The calculated tonnage is based on 230 lbs/SY, so the quantities are accurate.  
 
Question Date: 1/5/2024 11:00:00 AM
On page 234 of proposal Route 58 WB milepost 5.24 to Milepost 7.15 BMD-P+VO SM-12.5D states that depth of asphalt is 1.5" deep however lbs/SqYd is 230. Is depth suppose to be 2"?  
Answer   Date: 1/5/2024 1:21:27 PM
The depth should be 2". The calculated tonnage is based on 230 lbs/SY, so the quantities are accurate.  
 