Question List
Subject: ATMS Lane Control Type: Specifications
Question Date: 1/5/2024 8:14:57 AM
Please confirm, is the ATMS Lane Control Module described in pages 266 and 267 included in the base bid?  
Answer   Date: 1/5/2024 2:10:02 PM
The ATMS Lane Control Module is included under the base bid (Section 0001 Regular Bid Items). The special provisions for the ATMS Lane Control Module are described on page 276 of the Contract Documents.  
 
Subject: High Strength Geogrid Type: Plan
Question Date: 1/4/2024 10:52:11 AM
Sheet 9 of the Bridge Plans provides the design requirements for the High Strength Geosynthetic Fabric, but not the High Strength Geosynthetic Grid. Please provide the design requirements for the High Strength Geosynthetic Grid.  
Answer   1 previous answer(s) Date: 1/9/2024 1:48:46 PM
Please bid on this item based on the information provided in the plans and proposal documents.  
 
Question Date: 1/8/2024 11:59:42 AM
This looks like a spec for the fabric (5% strain) - what is the spec for the grid?  
Answer   Date: 1/9/2024 1:49:21 PM
Please bid on this item based on the information provided in the plans and proposal documents.  
 
Subject: temporary bypass DR17 HDPE Type: Plan
Question Date: 1/2/2024 3:37:00 PM
will sheet YR-3007 be included in the revision? it is a continuation of sheet TR-3006 but was not made available to contractors  
Answer   Date: 1/3/2024 12:03:09 PM
Valve guide YR-3007 is not required to accompany the plan set since it depicts valves outside of the scope of work.  
 
Subject: EP3 Type: Plan
Question Date: 12/21/2023 3:37:06 PM
How will the EP3 trough waterproofing be paid? Cannot find a bid item for it or it being tied to another item.  
Answer   Date: 12/28/2023 9:34:45 AM
Per 404.08 of the R&B specification, when waterproofing is not paid as a separate pay item, the price shall be included in the price of the concrete.  
 
Subject: Permanent Sheet Pile Type: Plan
Question Date: 12/21/2023 2:32:48 PM
The permanent sheet pile on Sheet 9 of the bridge plans requires A690, Grade 50 steel, as well as Hot Dipped Galvanized (HDG) finish. Typically, sheet piles are either A690 or HDG, not both. Please confirm that the Department wants A690 steel and HDG finish.  
Answer   Date: 12/28/2023 9:34:25 AM
The Department is requesting the A690, Grade 50 sheet piles be Hot Dip Galvanized.  
 
Subject: lightweight aggregate Type: Specifications
Question Date: 12/20/2023 3:34:57 PM
gradation analysis is showing 90-100 passing a #4 spec which would be fines - this should be 'retained' or only 10% passing also the weight at 50 pcf moist compacted weight is not possible for expanded slate or shale - compacted moist weight will be around 60 pcf in place  
Answer   Date: 12/21/2023 2:09:22 PM
The spec should refer to 10% passing for the no. 4 gradation, not 90-100. 60 pcf moist compacted will be acceptable for the requested application. Addendum forthcoming.  
 
Subject: Roadway Plans Type: Plan
Question Date: 12/19/2023 3:51:34 PM
The following Roadway Sheets have duplicate pages with separate layers showing on each page: 13-17, 20(2), 21(2), 23(2), 26(2), 2J(1)-2J(5). The following Roadway Sheets appear to be missing from the combined file: 11B, 13B, 14B, 15B, 16B, 17B, 21(12), 24A(2), 25(22), 28(19). The sheets for the combined Roadway Plan set are also not in order. Please correct the order of plan sheets for any plan revisions.  
Answer   Date: 12/21/2023 4:41:56 PM
Duplicate roadway sheets have been removed from the combined PDF and sheets have been placed in order. The sheets listed as “missing from the combined file” are not intended to be included with the contract documents.  
 
Subject: Bid Date Type: Proposal
Question Date: 12/19/2023 2:21:30 PM
We respectfully request a 2 week bid date extension for this project.  
Answer   Date: 12/21/2023 11:28:47 AM
The Let date will remain as shown in the proposal for January 10, 2024.  
 
Subject: Additive Type: Specifications
Question Date: 12/18/2023 8:51:39 AM
Is the Additive Alternate truly Additive, or is it standalone?  
Answer   Date: 12/19/2023 2:57:09 PM
Refer to Base, Alternate/Additive Category Bid Item and Award of Contract Special Provision in the Bid Package.  
 
Question Date: 12/20/2023 9:07:26 AM
If it is additive, are there any items from the base that are removed?  
Answer   Date: 12/26/2023 10:21:23 AM
No. The items included in the additive section are in addition to the base items. No base items would be replaced.  
 
Subject: Merged Plansets Type: Plan
Question Date: 12/13/2023 2:08:27 PM
Where are the merged plan sets for this project? They were available at the end of November but I do not see them now. Thanks!  
Answer   Date: 12/13/2023 2:53:16 PM
The merged plans are there now in a .set file.  
 

Displaying questions 1 - 10 (of 10)