Question List
Subject: Milled Surface Type: Specifications
Question Date: 6/15/2023 11:24:57 AM
How long will milled surface be allowed to be exposed?  
Answer   Date: 6/16/2023 4:57:53 PM
Please see Section III-C for All Other Roadways of the SP515-000100-00 for COLD PLANING (MILLING) ASPHALT CONCRETE OPERATIONS  
 
Subject: Marking Type: Specifications
Question Date: 6/15/2023 11:21:32 AM
Will temporary marking be required on milled surface?  
Answer   Date: 6/16/2023 4:57:27 PM
Depending on the Contractor’s sequence of construction, the Contractor may need to install adequate temporary markings and MOT devices to ensure the safety of drivers at all times, and maintain the operations of each lot until all the permanent markings are installed in their final configuration. Please also see 10-27-16 (SPCN) for TRAFFIC MANAGEMENT PLAN in the Contract document.  
 