Subject: Line Item 0540 Type: Plan
Question Date: 4/20/2023 11:43:30 AM
Where does Conc foundation STP-2 typD appear on the drawings? There is no reference to STP-2 typ D on the summary of quantities or the sign schedule. The call out is for 47LF; how many posts/foundations are required?  
Answer   1 previous answer(s) Date: 4/21/2023 11:50:22 AM
Item # 50463 will be removed via forthcoming addendum.  
 
Subject: Proposal Line Item 0680 51965 Install conduits on Bridge Type: Specifications
Question Date: 4/17/2023 2:45:08 PM
Can more detail be provided for this item; specifically, what type of conduit is required; how is conduit to be supported; how is this conduit to transition back to underground conduit.  
Answer   Date: 4/17/2023 3:57:19 PM
Note 12 on Sheets 5(1) through 5(3) state the contractor is to provide engineered drawings of proposed conduit attachment methods to Structure and Bridge for Review and concurrence.  
 
Subject: Updated Bidders List Type: Other
Question Date: 4/7/2023 12:18:16 PM
Is there a reason why the excel spreadsheet for the bidders for this project has not been updated since 3/17?  
Answer   Date: 4/10/2023 8:14:02 AM
It has now been updated. Thank you.  
 