Subject: Project Survey Type: Plan
Question Date: 10/5/2022 12:13:36 PM
There is no pay item for Survey. The plans did not say that state forces will handle the survey. How will Survey for the project be Paid?  
Answer   Date:
 
 
Subject: Material provided by Dominion Type: Plan
Question Date: 10/3/2022 9:20:10 AM
Will the contractor be required to install the material provided by Dominion? The line items do not reflect an "install" only, it seems all items are provided by the contractor. However, the material provided by Dominion is referenced several times in the plans.  
Answer   Date:
 
 
Subject: Lighting Pole LP-2 Ty D Type: Specifications
Question Date: 10/3/2022 9:17:40 AM
Will you clarify that LP-2 are required? The line items show LP-2 and the drawings show LP-1 as being installed. Also, according to spec the LP-1 is capable of having a luminaire arm.  
Answer   Date:
 
 