Subject: Bridge Incidentals Temp Shoring Type: Plan
Question Date: 9/21/2022 12:31:03 PM
-Line Item 67904 -Spec Book Page 93 'This work shall consist of designing, furnishing, and installing temporary shoring at the locations shown on the plans." Approximate limits of temporary shoring shown on the plans are for informational purposes only." I do not see any of these notes on the plans.  
Answer   Date: 9/22/2022 8:15:47 AM
For bridge B601, sheet 2 references the Special Provision for Temporary Shoring for additional information. Sheet 4 includes details pertaining to the temporary shoring.  
 
Subject: Quantity of Anodes Type: Bid Sheet
Question Date: 9/7/2022 3:22:19 PM
This project call for 7,377 anodes, which seems to be very excessive. In our experience, when the numbers are very high, VDOT usually ends up requiring a small fraction of the number given on the bid items list. Could the department please review and confirm this number?  
Answer   Date: 9/9/2022 12:12:50 PM
The quantity of galvanic anodes was reviewed and is consistent with Section 412.03 of the VDOT Specifications. Since anodes are located around the perimeter of a repaired area, the total number of anodes grows when there are numerous patches that are not connected to one another.  
 

Displaying questions 1 - 2 (of 2)