Subject: Plans Type: Plan
Question Date: 9/22/2022 3:00:42 PM
Can VDOT provide the volume and rate of flow for the Ordinary High Water (OHW) required for the pipe sizing and design for all locations?  
Answer   1 previous answer(s) Date: 9/26/2022 2:42:47 PM
Water Flow Rates have been posted to Project Wise.  
 
Question Date: 9/22/2022 3:00:07 PM
Notes which require the Contractor to “size” the pipe through cofferdam is on stated on Page 174 for Rte. 603 over Tastine Creek. Is this the only structure which requires design of the temporary through pipes?  
Answer   Date: 9/26/2022 1:57:06 PM
Cofferdam design and details, including the through piping as shown on pages 143, 174, 194, and 199 of the proposal, are required to be submitted to the Engineer for review and approval.  
 
Subject: proposal Type: Proposal
Question Date: 8/18/2022 11:06:51 AM
The proposal construction details for the project appear incomplete Please update construction details for Dogwood Fork ID #10614 and Mill Creek ID #30014  
Answer   Date: 9/1/2022 3:12:23 PM
This has been addressed via addendum as posted.  
 