Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
976
119873
PM9C-029-F22, N501
7/22/2022
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
FDR
Type:
Other
Question
Date:
7/21/2022 3:53:08 PM
Are there any existing utilities within 24" of finished asphalt grade?
Answer
Date:
7/22/2022 12:33:27 PM
The Contractor must comply with the Miss Utility law and identify any conflicts. Utility markings must be maintained as required by law.
Subject:
FDR
Type:
Specifications
Question
Date:
7/20/2022 2:18:08 PM
Can the asphalt be milled off first? Or do you have to pre-pulverize prior to removing excess?
Answer
Date:
7/20/2022 3:39:11 PM
Asphalt may be milled off first. However, this will not change the scope of the bid item nor its method of payment.
Question
Date:
7/18/2022 2:48:18 PM
Per addendum 1 on 7/14/2022, the specs do no specify using a curing seal or sand (no. 10 aggregate). The street list in the project proposal says to use a liquid asphalt for curing of cement and sand (see page 287 Rt. 2214, for example). Is the contractor required to use a curing seal or aggregate on top of the stabilized course?
Answer
Date:
7/18/2022 3:53:15 PM
Please use a seal of liquid asphalt to cure.
Question
Date:
7/18/2022 2:47:20 PM
Per addendum 1 on 7/14/2022, the specs specify using 5% cement by weight for bidding purposes, but the street list in the project proposal say use 9% (see page 287 Rt. 2214, for example). Please verify which should be used.
Answer
Date:
Question
Date:
7/18/2022 2:47:18 PM
Per addendum 1 on 7/14/2022, the specs specify using 5% cement by weight for bidding purposes, but the street list in the project proposal say use 9% (see page 287 Rt. 2214, for example). Please verify which should be used.
Answer
Date:
7/18/2022 3:51:55 PM
Mix design by contractor is not required. Please use the 9% by weight cement as specified.
Question
Date:
7/18/2022 2:46:40 PM
Per page 287 in the project proposal (Rt. 2214) the notes read that a mix design is not required, and the cement content is 9% by weight. Per the FDR specs posted on 7/14/2022, it reads that a mix design is required by the contractor. Can you verify if a mix design provided, by the contractor, will be required for this job?
Answer
Date:
7/18/2022 3:51:14 PM
Mix design by contractor is not required. Please use the 9% by weight cement as specified.
Displaying questions 1 - 2 (of 2)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
6/10/2023 12:25:27 AM
2008