Order Number UPC State Project Number Last Date to Post Questions
G77 104177 0033-082-805,B624,C501 6/17/2022
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Asbestos Reports Type: Other
Question Date: 6/21/2022 12:14:00 PM
It appears one Asbestos report was provided for Structurw 1083, are the other reports available to properly price the other three structures?  
Answer   Date: 6/21/2022 2:54:06 PM
The reports for all structures are posted.  
 
Subject: Stormwater structure 5-6 outlet Type: Permits
Question Date: 6/17/2022 11:14:57 AM
Do the Environmental Permits cover any temporary fill or a causeway in the channel/creek for the placement of the end-wall and riprap for storm-water structure 5-6 as all of this work is in the channel?  
Answer   Date:
 
 
Subject: Temporary Storm Structures Type: Plan
Question Date: 6/17/2022 11:01:59 AM
For the temporary storm structures that will have to be modified later in the project will inverts need to be poured prior to being put into use or can these be poured once the structures have been modified to their final configuration?  
Answer   Date: 6/17/2022 4:54:25 PM
We pouring prior since this is a long duration project.  
 
Subject: 1760 Relocate Existing Signal Equipment Type: Plan
Question Date: 6/16/2022 3:56:40 PM
What size is the existing fiber optic cable to be relocated?  
Answer   Date:
 
 
Subject: Material Procurement Type: Specifications
Question Date: 6/16/2022 1:26:11 PM
With the current climate of material shortages and unusually long lead times, how will the Department handle any material delays beyond the contractors’ control?  
Answer   Date: 6/17/2022 4:52:22 PM
Contractors should bid and plan work with consideration to material prices and lead times. Specific material availability issues should be brought to attention of VDOT as early as possible  
 
Subject: Line Items 1020 and 1030 Type: Bid Sheet
Question Date: 6/16/2022 1:02:16 PM
Is the intent to utilize VIA post for these items. Is a test bore truly necessary; per standards its is not for VIA post. Can wooden posts be used?  
Answer   Date: 6/17/2022 4:53:11 PM
The I-81 NB and SB temporary sign design is up to the contractor. The sign will need to be in use until the final overhead signs are installed. The cost for Route 33 temporary sign foundation is a Lump Sum.  
 
Subject: Bid Item# 2880 806 / 57170 - Environmental Sensor Stations Type: Other
Question Date: 6/14/2022 7:03:00 PM
Does VDOT use their own software to communicate with these stations? If so, what is the name of the software? Is the communication via NTCIP?  
Answer   Date: 6/16/2022 9:26:55 AM
No, software is based on the manufacturer recommendations and is not specified in the plans.  
 
Question Date: 6/15/2022 9:03:02 AM
What plan sheet number details the ESS?  
Answer   Date:
 
 
Question Date: 6/14/2022 7:02:57 PM
Does VDOT use their own software to communicate with these stations? If so, what is the name of the software? Is the communication via NTCIP?  
Answer   Date: 6/16/2022 9:28:42 AM
See previous response.  
 
Question Date: 6/15/2022 9:03:02 AM
What plan sheet number details the ESS?  
Answer   Date:
 
 
Subject: 18" sanitary sewer Type: Plan
Question Date: 6/14/2022 11:24:05 AM
The existing sanitary sewer manhole 14-46 appears to be a fragile structure that has been repaired in the past, is this structure sufficient for the tie in with the new 18" ductile iron pipe?  
Answer   Date: 6/17/2022 9:45:22 AM
The City will be replacing this manhole and the sewer main upstream of this manhole in the next few years. They suggest the contractor parge the outside of the manhole with concrete for structural enhancement if necessary. They believe a 1” thick concrete parge covering the entire manhole should be sufficient. Most of this manhole is already exposed.  
 
Question Date: 6/14/2022 11:01:01 AM
Is the existing 18" sanitary sewer pipe asbestos concrete?  
Answer   Date: 6/17/2022 9:46:20 AM
The existing pipe out of manhole 14/46 is concrete. The City’s Engineer does not have any record of it being AC pipe and in his opinion its concrete only, no asbestos.  
 
Subject: Pipes that are to be abandoned and removed Type: Specifications
Question Date: 6/14/2022 11:03:12 AM
Will all temporary storm water pipes installed that will be removed or abandoned later in the project need to have the post installation inspection performed?  
Answer   Date: 6/16/2022 9:28:03 AM
No  
 
Subject: 18" sanitary sewer Type: Permits
Question Date: 6/14/2022 10:57:13 AM
As the existing manhole 14-46 is mostly exposed in the ditch line and so is the existing 18" sanitary sewer line will fill material be able to be installed in the current channel to backfill the sanitary sewer items installed with this project?  
Answer   Date: 6/17/2022 9:47:10 AM
City does not require fill material to be placed over the new pipe within the stream channel. City allows for exposed pipe to be supported by stream piers, which is depicted on the Stream Bed Anchor detail on sheet 18(2D) of the plans.  
 