Project Info
Order Number UPC State Project Number Last Date to Post Questions
F97 110914 0001-088-709,C501,B617,D609-10 4/22/2022
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Previous Addendum Letter Posted Type: Proposal
Question Date: 4/18/2022 7:27:43 AM
It appears the previous revision letter was posted to the cabb system. Please post the updated letter.  
Answer   Date:
 
 
Subject: Line item Quantity Conflicts in AASHTOWare File Type: Bid Sheet
Question Date: 3/11/2022 4:28:27 PM
The quantity on bid items 1210 & 1220 are only two decimal places in the AASHTOWARE file but three decimal places on the schedule of items in the proposal. Is this going to cause any problems when the bid is submitted?  
Answer   1 previous answer(s) Date: 3/14/2022 10:06:48 AM
Correction: Upon further review, we will issue a revision to round the referenced bid items to two decimal places, in order to prevent any errors.  
 
Subject: Retaining Wall Work Area Type: Plan
Question Date: 3/10/2022 3:40:46 PM
Plan Sheet 1J2 states the work area for the retaining walls is behind the existing guardrail, however, retaining wall 2 extends past the guardrail and the corner of retaining wall 1 is within inches of the guardrail but there is no plan or barrier shown to protect the traffic from the excavation. Please clarify.  
Answer   Date: 3/11/2022 10:17:29 AM
Temporary barrier is not required per Figure 2 on page A-4 of the Work Area Protection Manual.  
 
Question Date: 4/6/2022 4:54:17 PM
Although typical sections of the retaining walls from sections that do not show an issue were included in the latest revision and the previous answers claim nothing is required by spec, we respectfully disagree and politely ask that the department take another look at the RW footer corners and take into consideration the amount of traffic (48000 per 2020 estimates), the expected Accident Frequency Factor (approx. 1.1), and construction ingress/egress.  
Answer   Date: 4/12/2022 9:07:37 AM
The plans will be revised to add a temporary barrier. A revision will be issued accordingly.  
 
Question Date: 3/18/2022 10:28:25 AM
Cross section 110+75 on sheet on sheet 99 of the X-Section set shows the retaining wall footer sitting underneath the existing roadway. Construction of Retaining Wall 2 and subsequent excavation thereof suggests that it would extend past the guardrail and curb exposing the SOE and work area to vehicular traffic. Please confirm that it is VDOT's intention to complete this construction without temporary barrier protection to both the workers and traffic. It should be noted that the excavation is approximately 13' in locations.  
Answer   Date: 3/25/2022 12:28:55 PM
Per the VaWAPM, pg. A-4, temporary barrier service is not required for the construction of the proposed retaining wall.  
 
Subject: Project Status Update Type: Other
Question Date: 3/9/2022 4:35:12 PM
Will this project be bidding this month? Please provide a project status update..  
Answer   Date: 3/10/2022 8:33:17 AM
Yes, the bids will be received on 3/23/2022. An addendum will be posted by COB Friday, 3/11/2022.  
 
Subject: DBE Type: Proposal
Question Date: 2/8/2022 2:30:31 PM
The DBE goal is listed as 12% on the CABB system and the EBS file but is missing from the proposal. Please confirm the 12%.  
Answer   Date: 2/8/2022 3:14:57 PM
The DBE Goal of 12% is correct and will be included in the proposal via forthcoming addendum.  
 
Subject: Line Number 0930 - Reinforcing Steel Type: Bid Sheet
Question Date: 2/8/2022 2:26:23 PM
If this item is for plain reinforcing steel for the box culverts and the retaining walls, please verify type and quantity.  
Answer   Date: 2/10/2022 9:41:18 AM
63,130 pounds is for the retaining walls. 19,769.91 pounds is for D-609. 37,810 pounds is for D-610. All reinforcing steel shall conform to ASTM A615, Grade 60 except for steels noted as Corrosion Resistant Reinforcing (CRR) which shall conform to Section 223 of the specifications  
 
Question Date: 3/18/2022 10:38:02 AM
The VDOT standard for box culverts states the quad box culvert shall have corrosion resistant reinforcing steel class 1 due to the shallow cover but the plans do not. Please confirm that this reinforcing steel type will be paid under the plain reinforcing steel item.  
Answer   Date: 3/22/2022 5:24:00 PM
The plans and quantities will be revised to include a bid item for the corrosion resistant reinforcing steel.  
 
Question Date: 3/18/2022 10:37:57 AM
The VDOT standard for box culverts states the quad box culvert shall have corrosion resistant reinforcing steel class 1 due to the shallow cover but the plans do not. Please confirm that this reinforcing steel type will be paid under the plain reinforcing steel item.  
Answer   Date:
 
 
Question Date: 3/18/2022 10:37:55 AM
The VDOT standard for box culverts states the quad box culvert shall have corrosion resistant reinforcing steel class 1 due to the shallow cover but the plans do not. Please confirm that this reinforcing steel type will be paid under the plain reinforcing steel item.  
Answer   Date:
 
 
Question Date: 2/8/2022 2:20:11 PM
Line Number 0930 has a quantity of 120,709.910 LB. Is this item for the box culvert extension reinforcing steel? If so please confirm type and quantity is correct?  
Answer   Date: 2/10/2022 9:42:06 AM
63,130 pounds is for the retaining walls. 19,769.91 pounds is for D-609. 37,810 pounds is for D-610. All reinforcing steel shall conform to ASTM A615, Grade 60 except for steels noted as Corrosion Resistant Reinforcing (CRR) which shall conform to Section 223 of the specifications.  
 
Question Date: 3/18/2022 10:38:02 AM
The VDOT standard for box culverts states the quad box culvert shall have corrosion resistant reinforcing steel class 1 due to the shallow cover but the plans do not. Please confirm that this reinforcing steel type will be paid under the plain reinforcing steel item.  
Answer   Date: 3/22/2022 5:24:00 PM
The plans and quantities will be revised to include a bid item for the corrosion resistant reinforcing steel.  
 
Question Date: 3/18/2022 10:37:57 AM
The VDOT standard for box culverts states the quad box culvert shall have corrosion resistant reinforcing steel class 1 due to the shallow cover but the plans do not. Please confirm that this reinforcing steel type will be paid under the plain reinforcing steel item.  
Answer   Date:
 
 
Question Date: 3/18/2022 10:37:55 AM
The VDOT standard for box culverts states the quad box culvert shall have corrosion resistant reinforcing steel class 1 due to the shallow cover but the plans do not. Please confirm that this reinforcing steel type will be paid under the plain reinforcing steel item.  
Answer   Date:
 
 
Subject: Cofferdams Type: Bid Sheet
Question Date: 2/4/2022 9:12:20 AM
There are two cofferdam items. Line #1450 & Line #2300 with quantities of 8 EA & 2 EA respectively. #2300 with 2 EA is for the retaining walls. Is it VDOT's intention that all 8 EA of #1450 are for the box culvert extensions?  
Answer   Date: 2/7/2022 10:29:13 AM
Yes, the 8 item #1450 COFFERDAM are for the box culvert extensions.  
 
Subject: Underdrain Type: Plan
Question Date: 2/3/2022 11:57:45 AM
There is a table for underdrain on sheet 2J(4). There is an additional table on sheet 2L. Which is correct?  
Answer   Date: 2/7/2022 12:35:32 PM
The UD table on sheet 2L will be deleted. The table on 2J(4) is correct.  
 
Subject: Storm Sewer Pipe 12” Type: Bid Sheet
Question Date: 2/3/2022 11:57:20 AM
There is a bid item for Storm Sewer Pipe 12”. There is none shown on the plans. What is this item for?  
Answer   Date: 2/7/2022 12:35:50 PM
This item will be deleted. There is no 12" storm sewer pipe required.  
 
Subject: "Low Permeability Liner” in SB-1 Type: Bid Sheet
Question Date: 2/3/2022 11:56:40 AM
Sheet 2K references the use of a “Low Permeability Liner” in SB-1. How is this to be paid for?  
Answer   Date: 2/7/2022 12:36:14 PM
The low permeability liner is not required and plan sheet 2K will be revised to remove the reference.  
 

Displaying questions 1 - 10 (of 17)