Order Number UPC State Project Number Last Date to Post Questions
F49 688 U000-128-113, C502 7/23/2021
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Modify Signal 13th St. @ Tazewell Ave Type: Plan
Question Date: 7/15/2021 9:17:23 AM
Plan sheet IH(3) requests the contractor to cover traffic signal heads. Is the contractor expected to adjust timings during this time period? Due to the age of the equipment the timings can only be adjusted on two approached and not four. Please advise.  
Answer   Date: 7/15/2021 4:30:02 PM
No, The contractor is not expected to adjust the timings of the signal during that period. Since Northbound/Southbound run concurrently on one phase, we are proposing to cover the signal heads, and that phase will serve Northbound traffic only during the detour. Based on current traffic patterns, we do not anticipate this being an issue during the detour.  
 
Subject: 4.5" Deep Milling Type: Bid Sheet
Question Date: 7/12/2021 9:41:06 AM
The typical section for Norfolk Avenue on sheet 2C of the plans shows 4.5" Mill and Replace on the existing roadway section but the only milling bid item is 0"-2", is the typical marked incorrectly or will a milling bid item be added for the 4.5" depth shown?  
Answer   Date: 7/15/2021 4:29:11 PM
Milling Item 10630 will be added for Flexible Pavement Planing above 4" =1436 SY. Flexible Pavement Planing 0-2" Item 10628 will be reduced to 634 SY. The revised summary sheet 2H has been posted to reflect these changes.  
 
Subject: Geotechnical Type: Specifications
Question Date: 7/1/2021 12:00:01 PM
Could you post any available soils reports?  
Answer   Date: 7/8/2021 10:39:21 AM
Geotechnical files have been uploaded to ProjectWise.  
 
Subject: Plan Sheets Type: Plan
Question Date: 7/1/2021 10:50:27 AM
Schedule of items show a pay item for 112'LF of Sign Post STP-1 2 1/2" 12 Gauge. In the plans there is no 2 1/2" 12 gauge stp-1's in the summary on quantities. Can you please clarify?  
Answer   Date: 7/6/2021 8:38:54 AM
The 112 LF of Sign Post STP-1 2 1/2" 12 Gauge is shown on the MOT Summary Sheet 2H.  
 

Displaying questions 1 - 4 (of 4)
Page: 1 First Previous Next Last