Order Number UPC State Project Number Last Date to Post Questions
F45 111303 0064-127-925, B628 7/23/2021
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Girder repair Type: Plan
Question Date: 7/23/2021 5:47:20 PM
On the replace cross frame girder plan showing that we are replace girder as well. Please confirm that we are also quote to replace the girder.  
Answer   Date: 7/26/2021 8:31:01 AM
No girders are to be replaced.  
 
Subject: Project Duration Type: Proposal
Question Date: 7/20/2021 2:19:48 PM
Due to the ongoing volatility of materials and their current lead times, Will the Department consider reevaluating the given time frame for completion of this project?  
Answer   Date: 7/26/2021 8:33:00 AM
The fixed completion date will remain as is.  
 
Subject: Detour Type: Proposal
Question Date: 7/20/2021 2:17:34 PM
What is the allowable time and duration that the Department will allow for a full detour of traffic on Bridge B-628?  
Answer   Date:
 
 
Subject: Joint Sealer Payment Type: Plan
Question Date: 7/19/2021 11:46:32 AM
Drawing sheet 31 shows 2" thick class II adhesive based joint sealer in the parapet joints, where will payment for this material be made?  
Answer   Date: 7/20/2021 3:38:11 PM
Cost of Class II adhesive based joint sealer associated to Elastomeric Expansion Dam is to be included in the bid price of Elastomeric Expansion Dam.  
 
Subject: Existing Girder Splices Type: Plan
Question Date: 7/19/2021 10:51:48 AM
During our site visit we saw that the existing girders in span C near pier 3 have bolted splices. The existing drawings do not show the splice locations. We are repairing 12.5' long sections of the existing girders 2, 3 and 4, due to the proximity of the repairs, please furnish drawings showing the exact location of the splices. What are the design capacities of the splices?  
Answer   Date: 7/27/2021 8:36:05 AM
Proposed repairs do not extend to the existing splice location on Span C. Shop Drawings have been posted on CABB for review. If the Contractor’s means and methods require analysis of the capacities of the existing girder splice, that shall be the responsibility of the Contractor.  
 
Question Date: 7/19/2021 10:51:40 AM
During our site visit we saw that the existing girders in span C near pier 3 have bolted splices. The existing drawings do not show the splice locations. We are repairing 12.5' long sections of the existing girders 2, 3 and 4, due to the proximity of the repairs, please furnish drawings showing the exact location of the splices. What are the design capacities of the splices?  
Answer   Date:
 
 
Question Date: 7/19/2021 10:51:33 AM
During our site visit we saw that the existing girders in span C near pier 3 have bolted splices. The existing drawings do not show the splice locations. We are repairing 12.5' long sections of the existing girders 2, 3 and 4, due to the proximity of the repairs, please furnish drawings showing the exact location of the splices. What are the design capacities of the splices?  
Answer   Date:
 
 
Subject: Addendum 1 Plan Sheets Type: Plan
Question Date: 7/15/2021 2:45:41 PM
The plan sheets that are on cabb as of 2:4 5pm today 7/15 do not reflect the changes; when will the new addended plans be available?  
Answer   Date:
 
 
Subject: MOT for Pier 2 Type: Plan
Question Date: 7/2/2021 8:50:12 AM
There are 4 girder end repairs at Pier 2 on the Southbound side and 2 girder repairs on the Northbound side. The current traffic control plan on sheet 33(3) and 33(4) call for group 2 channelizing devices to be set up for the repairs. The repairs will require jacking towers and multiple days for the repairs. For the safety of the workers and the traveling public, please revise the traffic plan to use traffic barrier to separate the work area from traffic.  
Answer   Date: 7/6/2021 10:18:30 AM
No permanent lane closures will be approved; thus the conceptual jacking configuration presented on Plan Sheet 22.  
 
Subject: Jacking Plan Type: Plan
Question Date: 7/2/2021 8:49:09 AM
Sheet 19 of the plans does not show the location for the jacking towers for the pier 2 girder end repairs. Please revise the drawing to show their locations.  
Answer   Date: 7/6/2021 10:19:17 AM
Conceptual jacking locations are shown on Pier 2. Note, the drawings presented are jacking concepts and suggested only. The final design for all elements necessary to properly jack and support the bridge structure are to be prepared by an Engineer and submitted for approval as indicated in the notes.  
 
Question Date: 7/2/2021 8:49:05 AM
Sheet 19 of the plans does not show the location for the jacking towers for the pier 2 girder end repairs. Please revise the drawing to show their locations.  
Answer   Date: 7/6/2021 10:19:32 AM
Conceptual jacking locations are shown on Pier 2. Note, the drawings presented are jacking concepts and suggested only. The final design for all elements necessary to properly jack and support the bridge structure are to be prepared by an Engineer and submitted for approval as indicated in the notes.  
 
Subject: Mandatory Meeting Requirement? Type: Proposal
Question Date: 6/24/2021 11:33:31 AM
Is there any mandatory pre-bid meeting required to be in attendance to bid on this contract? Please advise.  
Answer   Date: 7/6/2021 10:20:09 AM
No  
 
Subject: As-Builts Type: Plan
Question Date: 6/24/2021 10:09:41 AM
Please provide the existing bridge drawings.  
Answer   Date: 7/6/2021 10:20:37 AM
We will provide the existing bridge drawings.  
 