Subject: Utilities Type: Plan
Question Date: 5/6/2021 7:47:54 AM
Are there any underground utilities present in the median at the Route 360 bridges?  
Answer   Date: 5/13/2021 10:38:06 AM
The Department does not have any knowledge of utilities located in the median at the Route 360 EBL and WBL bridges over the Appomattox River, but the presence of any utilities shall be verified by the Contractor prior to beginning construction to prevent any damage.  
 
Subject: Scour Countermeasures Type: Specifications
Question Date: 5/6/2021 7:45:46 AM
The installation section of the specification outlines grading and bedding requirements that will be required prior to placement of the Countermeasures. In our experience and after conversations with the countermeasure supplier these grading and bedding requirements will not be possible in a live stream, nor are they required by the manufacture. The manufacturer only requires any large voids or irregularities to be roughly graded to match the existing contours. Will the Department give consideration to preparing a separate specification for use when placing these units in the water.  
Answer   Date: 5/13/2021 10:37:44 AM
The existing special provision included in the contract applies when placing scour countermeasure units above and below ordinary high water. Divers may be utilized for individual unit placement, and as stated in the plans, pressure jetting may be used for excavation to prepare the subgrade.  
 
Subject: Scour Countermeasures Type: Bid Sheet
Question Date: 4/21/2021 1:56:52 PM
The work (effort and cost) involved in the installation of the scour countermeasures varies for each site. Can the bid item for the scour countermeasures be broken down per structure or per site?  
Answer   Date: 5/5/2021 9:56:18 AM
The Schedule of Items will be modified to include a pay item for scour countermeasures for each structure. " Structure Item Code Item Description Quantity Unit Rte. 636 over Flat Creek 69902 Scour Countermeasures Structure Number 6036 940 SF Rte. 629 over Deep Creek 69902 Scour Countermeasures Structure Number 6050 1242 SF Rte. 360 WBL over Appomattox River 69902 Scour Countermeasures Structure Number 1914 3492 SF Rte. 360 EBL over Appomattox River 69902 Scour Countermeasures Structure Number 1960 3050 SF  
 
Subject: Cofferdams Type: Permits
Question Date: 4/21/2021 1:52:56 PM
The permit for the RTE 636 bridge over Flat Creek requires a cofferdam and a means of access to the pier. There are no pay items for cofferdams. Please clarify measurement and payment for this work.  
Answer   Date: 5/5/2021 9:57:10 AM
The incorrect permit language was inadvertently included for Rte 636 over Flat Creek. The permit language will be revised to require the use of a turbidity curtain. A cofferdam will not be a requirement for Rte 636 over Flat Creek.  
 
Subject: Excavation Limits Type: Plan
Question Date: 4/21/2021 1:47:16 PM
Please provide elevations of the stream bed at the toe of the scour countermeasures at the piers and abutments  
Answer   Date: 5/5/2021 9:55:42 AM
The following elevations, taken at the toe of the scour countermeasure slope at the locations as noted, were used for estimating construction quantities at each bridge. Actual conditions may vary and elevations shall be field verified by the Contractor prior to beginning repairs at each structure. Rte. 636 over Flat Creek: - Abutment A: 202.06 - Pier, Span a: 202.80 - Pier, Span b: 203.14 - Abutment B: 203.79 Rte. 629 over Deep Creek: - Pier 1, Span a: 191.29 - Pier 1, Span b: 189.07 - Pier 2, Span b: 189.56 - Pier 2, Span c: 191.35 Rte. 360 WBL over Appomattox River: - Pier 1, Span a: 171.78 - Pier 1, Span b: 164.44 - Pier 2, Span b: 160.04 - Pier 2, Span c: 164.32 Rte. 360 EBL over Appomattox River: - Pier 1, Span a: 170.06 - Pier 1, Span b: 166.36 - Pier 2, Span b: 164.04 - Pier 2, Span c: 170.70  
 

Displaying questions 1 - 5 (of 5)