Question Date: 4/17/2026
Updated plans were provided through addendum modifying the Total Regular Excavation from the original plans. The bid items in the proposal and in the bidx files do not match the quantity in the original or revised plans. Please update the appropriate information with the correct quantity as Reg Ex is plan quantity the numbers need to be correct for pricing purposes. It is unclear which is in error, plans or bid sheets.
Answer History
Previous Answers PostDate
Please be advised that there are four (4) amendments in BidX: C0000119384C01.ebsx; C000019384C01.001x; C000019384C01.002x; C000019384C01.003x. Also, please note that there is regular excavation shown in the temporary traffic control summary on sheet 2D(1). Line 0360 Regular Excavation in the SOI is 61,526 CY. The Temporary Traffic Control Summary on Sheet 2D(1) includes 770 CY of Regular Excavation. The Grading Summary on Sheet 2K(2)_r5 includes 60,756 CY of Regular Excavation. The total of 2D(1) and 2K(2)_r5 is 61,526 CY. 4/17/2026
Please be advised that there are four (4) amendments in BidX: C0000119384C01.ebsx; C000019384C01.001x; C000019384C01.002x; C000019384C01.003x. 4/17/2026