Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number State Project Number Last Date to Post Questions
N08 0600-026-656,C501 9/19/2025
Question
Question Date: 9/3/2025
Will VDOT - Richmond District - Traffic Engineering be responsible for completing the Electrical Service Work Request with Dominion Energy for the electrical service, SE-5? If not, who will be responsible?
Answer History
Previous Answers PostDate
The SE-5 should be installed per the plans, but not energized. 9/9/2025
The SE-5 should be installed per the plans, but not energized. A plan revision is forthcoming to clarify this issue. 9/5/2025
The SE-5 should be installed per the plans, but not energized. A plan note will be added to include a vertical stub out and cap at the utility pole for future power connection. 9/5/2025
9/5/2025