Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number State Project Number Last Date to Post Questions
H80 0001-127-108,C501 3/22/2024
Question
Question Date: 3/20/2024
Line items calls for SP-9. Is this correct? I was advised that Richmond uses SP-8. Please advise.
Answer History
Previous Answers PostDate
The City of Richmond utilizes the SP-8 signal head. That being said, please bid the project as shown in the bid documents; the SP-9 signal head. The intent will be to issue a change order during construction to add the SP-8 and remove the SP-9. 3/21/2024
Richmond District utilizes the SP-9 signal head. That being said, please bid the project as shown in the bid documents; the SP-8 signal head. The intent will be to issue a change order during construction to add the SP-9 and remove the SP-8. 3/20/2024