U97 9999-964-669,P401 7/23/2021
Question
Question Date: 6/10/2021
The single axle restriction listed on Pg 147 essentially limits this work to small trailed mounted spray units. Page 139 states that the distributor shall be equipped with a monitoring system that ensures the even distribution of material and measures the application rate. As far as I can find, there are no single axle units in production capable of meeting these requirements. Would other methods of measuring material and application rates?
Answer History
Previous Answers PostDate
If the contractor elects to not use a metering device, two tests will be taken per shift in accordance with section 310 in the 2020 Road and Bridge Specifications. 6/18/2021
If the contractor elects to not use a metering device, two tests will be taken per shift in accordance with section 310 in the 2020 Road and Bridge Specifications. 6/18/2021