Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
B09 (CII)
110423
0156-074-785, B611
8/16/2019
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
WHERE IS THE BIDDER'S LIST FOR THIS?
Type:
Other
Question
Date:
8/19/2019 11:18:35 AM
I DO NOT SEE THE PLAN HOLDERS LIST, OR A BIDDER'S LIST??? I AM A SUPPLIER AND NEED TO KNOW WHO IS QUOTE THIS PROJECT SO THAT I MAY SEND MY QUOTE TO THEM.
Answer
Date:
Subject:
Request Changes to Bid Items
Type:
Bid Sheet
Question
Date:
7/30/2019 3:32:46 PM
Proposal Line Number 0030, 0040, 0050 are the three crack repair items on the project. The bid item provides the width and length of the cracks but not the depth of the cracks. The depth of the cracks will determine the amount of product used to fill the crack. It is impossible for the bidder to determine how much product to carry in their bid without knowing the depth of the crack. It would be better for the contractor and VDOT if there were a single bid item just for the material. Keep the existing 3 items for the prep of the crack and the filling and add 1 item for the material.
Answer
Date:
8/8/2019 2:40:41 PM
Material will not be separated into a separate item. Material should be quantified based on the crack depths and widths provided in the inspection report, available on ProjectWise. In the event site conditions prove to differ from the conditions within the inspection report, guidance in sections 104 and 109 of the specifications should be followed.
Displaying questions 1 - 2 (of 2)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
5/5/2024 7:51:50 AM
2008