Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
988
114239
PM9T-029-F19, N501
2/22/2019
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Contract Quantities
Type:
Plan
Question
Date:
2/21/2019 11:03:25 AM
Per sheet 127 of the PM9T-029-F19, N501 Order NO: 988 contract, Pimmit Dr. will receive per plan 1.50" of SM-9.5A & two lifts of IM-19.0 at 1.50" each. The IM-19.0 quantity listed is based off a 2.00" depth. The milling quantity is listed under 2-4" milling with a cut depth of 1.50". Building this street up seems unusual considering it has curb & gutter. Also, laying IM-19.0 at 1.50" depth is out of spec. Please clarify if these quantities and depths are correct.
Answer
Date:
2/26/2019 3:24:02 PM
It is not the intent to build-up this segment. The Depths shown for Flexible Pavement Planing Above 2"-4" and IM-19.0A are inaccurate. It is the Department's intent to perform 3.5" of Flexible Pavement Planing Above 2"-4" followed with 2" of IM-19.0A and 1.5" of SM-9.5A. No changes will be made to the Bid document prior to the Bid Letting. This route will be addressed during the Preconstruction Meeting.
Subject:
Limitations of Operations
Type:
Plan
Question
Date:
2/14/2019 8:14:37 AM
Per sheet 6 in the VDOT 988 contract under Limitations of Operations “No milled areas shall be left unpaved from Thursday evening through Sunday evening.” A majority of the schedule consist of subdivision routes which seems unusual to see limitations of this nature. Please clarify if this statement applies to the whole contract or just an individual section & if so please clarify that individual section/traffic group this statement applies too.
Answer
Date:
2/15/2019 9:16:54 AM
The "Limitations of Operations" SPCN with a Reissued date of 7-12-16 shall apply to all other roadways outside of the parameters of section III.A.1 of the Cold Planing (Milling) Asphalt Concrete Operations Special Provision, with designated Traffic Group of XIV and above.
Displaying questions 1 - 2 (of 2)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
3/29/2024 11:09:27 AM
2008