Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
136 112951 (NFO)PM1D-961-F20,N501 2/8/2019
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Density Acceptance & Payment Type: Proposal
Question Date: 1/30/2019 6:39:45 PM
On past projects, VDOT has requested that the contractor not perform vibratory compaction on roads that, based on the Traffic Group, are density incentive eligible. Will vibratory compaction be allowed for all routes listed in the proposal as Traffic Group X? If not, will these routes be eligible for the density incentive?  
Answer   Date: 2/7/2019 10:19:47 AM
If water lines are present on routes through towns smooth rolling will be required and these routes will not be eligible for density bonus.  
 
Question Date: 2/10/2019 12:58:45 AM
What routes in this proposal will not be eligible for the density bonus due to water lines?  
Answer   Date: 2/12/2019 9:53:17 AM
Field conditions will determine if a route will qualify for density bonus at the time work is being performed. This will be determined by the engineer. Density Bonus will only apply to routes with Traffic Count X or higher with 20 feet minimum roadway width per contract specs.  
 

Displaying questions 1 - 1 (of 1)
Page: 1 First Previous Next Last