Subject: Existing Fence Type: Other
Question Date: 8/17/2018 2:17:09 PM
There is an existing board fence that will need to be removed for the sediment basin construction. How will this be paid?  
Answer   Date: 8/17/2018 2:49:53 PM
The existing fence will be moved by the land owner prior to contract execution.  
 
Subject: Topsoil Type: Other
Question Date: 8/17/2018 10:04:57 AM
The roadside development page indicates that 1.7 acres will be disturbed and will need to be seeded. There is no bid item for topsoil. How will that be paid?  
Answer   Date: 8/17/2018 12:16:58 PM
No separate payment will be made for topsoil. The cost of stripping, stockpiling, and spreading of any topsoil shall be included in Regular Excavation  
 