Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
M35
107053
(NFO)0024-009-825, N501
10/20/2017
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Rumble Strip Locations
Type:
Proposal
Question
Date:
9/12/2017 11:05:17 AM
Page 123 of the proposal shows locations of Rumble Strips that require liquid asphalt coating, why is the WBL 147+75 to 157+25 listed if the project stops at 131+00 as shown?
Answer
Date:
9/13/2017 9:08:53 AM
Sorry. This was an old reference.The Rumble Strips need to end at the end of the project ( sta. 131+00 ).
Subject:
Existing Shoulder Conditions
Type:
Plan
Question
Date:
9/7/2017 1:48:03 PM
In reviewing the on site conditions, the WBL shoulder from approx. sta. 55+00 to 84+00 contains areas with such an extreme cross slope down to the guardrail that fill may be needed under the proposed 6' asphalt widening at the outside edge in lieu of trenching shown in the typical sections. Will the widening be narrowed up in these areas or will the contractor be required to fill these areas using the Lump Sum Grading and Aggregate 25 or 26 bid items? After widening will the remaining shoulder be filled in with the Aggregate 25 or 26 bid item for replacement of the guardrail to the proper height?
Answer
Date:
9/11/2017 10:03:19 AM
In the event the Contractor discovers the required bottom elevation from the milling operation is actually above the existing gravel shoulder grade, the Contractor may increase the depth of the BM-25.0A (T) asphalt up to a maximum depth of 8”. In the event the additional depth needed is in excess of 5”, the Contractor is to use the Aggregate #25 / #26 bid item to fill to the BM-25.0A (T) asphalt bottom elevation. Additional Aggregate #25 / #26 is to be placed outside the asphalt to complete the shoulder for guardrail installation.
Subject:
Other Work In Area
Type:
Other
Question
Date:
8/10/2017 9:06:11 AM
Part of this project overlaps a maintenance schedule currently under contract for route 24. How does the department anticipate coordination between the two projects?
Answer
Date:
8/29/2017 10:20:52 AM
Please price your bid to cut into the new area. If it becomes apparent that it is unnecessary during construction it can be adjusted in the field.
Displaying questions 1 - 3 (of 3)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
5/16/2024 9:39:33 PM
2008