Question
|
|
Date:
|
9/26/2017 3:19:38 PM
|
What is Line item 1060 intended to cover? I can not find this description anywhere in the specifications?
|
Answer
|
Date:
|
9/26/2017 4:03:03 PM
|
Line item 1060 is not needed. The work is covered in items 1050 & 1080. All bidders are instructed to bid zero (0.00) on line item 1060.
|
|
|
Question
|
|
Date:
|
9/26/2017 3:18:37 PM
|
Is Line Item 1050 intended to cover the demolition of both structures 1012 and 1013?
|
Answer
|
Date:
|
9/26/2017 3:56:24 PM
|
This is intended to cover both bridges for remove, dismantle, and dispose of materials.
|
|
|
Question
|
|
Date:
|
9/26/2017 8:40:36 AM
|
Will the railroad Right of Entry be granted prior to Notice to Proceed?
|
Answer
|
Date:
|
9/26/2017 8:43:28 AM
|
Due to the lateness of receipt of this document, the Norfolk Southern Right of Entry for this project can be viewed under the Announcements titled “M21 Norfolk Southern Right of Entry 9/25/17. That document will be part of the executed contract. Please bid accordingly.
|
|
|
Question
|
|
Date:
|
9/20/2017 2:07:28 PM
|
Can you clarify bid item 1060 Material Disposal Structures 1012 and 1013?
Is this for the concrete disposal and, if so, are any disposal manifest required?
|
Answer
|
Date:
|
9/25/2017 4:15:08 PM
|
The Department has determine that an Environmental Health and Safety plan was not required for Str# 1012 as this structure is all concrete.
There are no disposal manifest documentation requirements for concrete.
|
|
|
Question
|
|
Date:
|
9/20/2017 10:31:05 AM
|
The plans show 6160 sf of temporary shoring at structure B606. Four lines of shoring will be required at each abutment but only about 35 linear feet of shoring is shown at each location. The estimated quantities appears to include the area of temporary shoring under the excavation line. Can you either adjust the bid quantity or provide the estimated quantity and allowable limits of temporary shoring per location?
|
Answer
|
Date:
|
9/25/2017 11:52:37 AM
|
Please consider the ATTD on the pay item to mean PLAN .
The calculation for the sheet piling for B606 / UPC 77302 was based on four sections of piling at 35 feet in length times an average height of 22 feet. This resulted in the 6160 square foot quantity.
4 x 35 ft x 22 ft x 2 abutments = 6160 sq ft.
|
|
|
Question
|
|
Date:
|
9/18/2017 12:14:28 PM
|
For Sheet 2A of 0011-011-110, M501; is the 4" perforated pipe and the embankment stabilization fabric shown in Inset B, included in the price of the #357 stone?
|
Answer
|
Date:
|
9/26/2017 4:19:52 PM
|
The embankment stabilization fabric is included in the price for Item 00155 Geotextile (Embankment Stabilization). The 4” perforated pipe is incidental to the price for the #357 stone.
|
|
|
Question
|
|
Date:
|
9/15/2017 10:14:28 AM
|
The latest revision states that Bridge Sheet 2 was revised for UPC 77302. The date of 295-20 Sheet 2 has not changed.
|
Answer
|
Date:
|
|
|
|
|
Question
|
|
Date:
|
8/24/2017 12:14:34 PM
|
Plan set 295-20 (B606) appears to be missing @ Falcon. Please provide these sheets. Thanks-
|
Answer
|
Date:
|
8/25/2017 8:00:09 AM
|
The plan set for 295-20 (B606) is available in Falcon, the set is titled 295-20_001 – 295-20_039. The plan sheets, once opened, will reference the State Project Number 0111-011-110, M501 on the top right. The 295-20 reference is shown on the bottom right of the plan sheets.
|
|
|
Question
|
|
Date:
|
9/8/2017 4:01:43 PM
|
Please recheck Falcon. Plan set 295-20-001 thru 295-20-039 does not appear to have been posted. Thanks!
|
Answer
|
Date:
|
|
|
|
|
Question
|
|
Date:
|
8/25/2017 9:20:23 AM
|
I have rechecked Falcon & still do not see the bridge plans for B606 (295-20). I see the road plans & cross sections (0011-011-110),
however, no bridge details for B606. Please recheck & advise. Thanks-
|
Answer
|
Date:
|
|
|
|
|
Question
|
|
Date:
|
8/11/2017 4:02:01 PM
|
I do not see 295-20 (other bridge) 1 - 39??????
|
Answer
|
Date:
|
|
|
|
|
Question
|
|
Date:
|
8/9/2017 1:58:14 PM
|
There is only one bridge provided with the electronic plans.
|
Answer
|
Date:
|
8/11/2017 1:59:20 PM
|
All electronic files are now available.
|
|
|
Question
|
|
Date:
|
8/8/2017 4:47:06 PM
|
The Proposal lists 2 Project Numbers, describes the Project as 'Bridge Replacements' (plural), has 'Various' for the Locations, and contains 2 Notices for Authorization, one for a 112.50' x 56' Bridge, and the other with a 65.95' x 56' Bridge.
Plans are only provided for the 112.50 x 56' Bridge, but the Bid Item approximate quantities are for significantly more than the one Bridge.
Many of the Bid Documents reference the 2 project Numbers.
Can you confirm that we are to Bid Project Number: (NFO) 0011-011-109, M501, B605, and that we are not bidding (NFO) 0011-011-110, M501, B606?
|
Answer
|
Date:
|
8/11/2017 2:02:02 PM
|
All electronic files are now available, bids to be submitted are for both projects referenced.
|
|
|
Displaying questions 1 - 10 (of 11)
Page:
1 2 First Previous Next Last
|