Advertisements
Division Home
Bid Results
Bid Tabs
Ad Report
VDOT Forms
Login Or Create Account
Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
K42
108423
(NFO)0064-122-346,N501
9/23/2016
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
Conduit Installation
Type:
Plan
Question
Date:
9/22/2016 1:04:29 PM
Specification page 226- Location 4 drawing page show the 2" conduit from junction box to structure being installed under and behind the existing sound wall. Please verify this is correct.
Answer
Date:
9/26/2016 10:36:40 AM
The 2” conduit will not go behind the sound wall. Per the drawing it was graphically shown like this, but the conduit will be installed in front of the sound wall.
Question
Date:
9/22/2016 1:03:28 PM
Specification page 226- Location 4 drawing page show the 2" conduit from junction box to structure as metal installed under ground. is this the correct application?
Answer
Date:
9/26/2016 10:37:30 AM
YES
Subject:
UPS Cabinet
Type:
Specifications
Question
Date:
9/22/2016 12:57:04 PM
The specifications for the UPS cabinet refer to a vague ITS plan that does not apply to the intended use for this project. Please provide an applicable specification for the UPS Cabinet.
Answer
Date:
9/26/2016 10:37:21 AM
Please look at page 210 of the proposal and see the diagram that shows the Uninterruptable Power Supply mounted to the metal frame. Next look at page 214, 215, 218 and 219. On page 218 shows the numbering and it matches up with page 219 for the UPS Cabinet and Uninterruptable Power Supply. This helps support Spec section 801 and 802.
Subject:
Clarification
Type:
Specifications
Question
Date:
9/22/2016 11:20:12 AM
Lime Item 0150 is listed as EC-2 Type 2. EC-2 materials has no "type" designation. Please clarify correct material required.
Answer
Date:
9/22/2016 2:23:00 PM
In Spec. section 606 it refers to 244.02 for the Type 2 material required.
Subject:
Over height detector
Type:
Plan
Question
Date:
9/22/2016 11:04:32 AM
Please verify that VDOT will be providing the over height detector and all associated materials
Answer
Date:
9/22/2016 2:23:45 PM
VDOT will be furnishing the over height detector which includes the master and remote detector units with controller, and the detector mounting brackets. All other associated materials to be furnished and installed by the Contractor. Please refer to spec. OVERHEIGHT VEHICLE DETECTION SYSTEM, PAGE 112.
Subject:
Maintenance of Traffic
Type:
Other
Question
Date:
9/22/2016 11:03:07 AM
Please verify that VDOT WILL NOT be providing any Maintenance of Traffic for this project and that all Maintenance of Traffic line Items will remain on the bid.
Answer
Date:
9/22/2016 2:24:11 PM
Correct, all maintenance of traffic will be responsibility of contractor.
Subject:
Location #5
Type:
Specifications
Question
Date:
9/19/2016 4:23:06 PM
Location #5 call for structural modifications. please clarify
Answer
Date:
9/22/2016 2:26:50 PM
No modifications to the existing structure at Location #5 are necessary.
Question
Date:
9/23/2016 4:12:57 PM
BIDEX WILL NOT ALLOW A BID OF $0.00... HOW WILL THIS BE ADDRESSED?
Answer
Date:
9/26/2016 10:23:19 AM
Please bid $0.00 for this item. BidX will allow a zero bid, just not leaving it blank.
Subject:
UPS requirements
Type:
Specifications
Question
Date:
9/19/2016 11:30:33 AM
There are no details / specification for the UPS system. Please provide clarification
Answer
Date:
9/22/2016 2:25:00 PM
Details / specifications for the UPS system can be found in Section 801.05 of the special provisions and in Section 802 of VDOT’s 2016 Road and Bridge Specifications.
Question
Date:
9/23/2016 9:59:13 AM
Section 801.05 is in regards to the UPS cabinet with no specification requirements for the UPS. Please explain
Answer
Date:
9/26/2016 2:40:14 PM
The specification requirement for the Uninterruptable Power Supply, ITS-CC is provided under Section 802 of the 2016 Road and Bridge Specifications.
Subject:
Modify existing structure location #5
Type:
Proposal
Question
Date:
9/19/2016 11:27:05 AM
Please clarify the requirements for this pay item.
Answer
Date:
9/22/2016 2:26:17 PM
No modifications to the existing structure at Location #5 are necessary.
Displaying questions 1 - 8 (of 8)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
5/11/2024 5:42:21 AM
2008