Advertisements   Division Home   Bid Results   Bid Tabs   Ad Report   VDOT Forms
Project Info
Order Number UPC State Project Number Last Date to Post Questions
J42 107420 (NFO)0264-965-250,N01 3/18/2016
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Work Hours Type: Plan
Question Date: 3/8/2016 10:29:22 AM
There is no mention of work hours /lane closure restrictions in the spec book.  
Answer   Date: 3/9/2016 11:44:57 AM
Note page 190 of the contract: Temporary Traffic Control Plan. Work hours/Lane Closure restrictions will be determined when individual tasks are assigned.  
 
Subject: Line Item 0300 Clean and Recoat Bearings Type: Proposal
Question Date: 3/8/2016 10:08:55 AM
QP1/QP2 cert required for this line item?  
Answer   Date: 3/9/2016 11:46:12 AM
A QP1/QP2 Certification is required per Section 411 of the specifications.  
 
Subject: Access Type: Plan
Question Date: 3/8/2016 9:56:35 AM
Hampton Roads District has large structures over water which access can be very costly. Barge/Intricate Scaffold Systems/ Snoopers will all be required to access some structures. Is this incidental?  
Answer   Date: 3/9/2016 11:44:10 AM
No. The cost of access equipment and materials shall be included in the price bid for the appropriate items.  
 
Subject: Debris Shield Type: Plan
Question Date: 3/8/2016 9:52:25 AM
Will debris shields be required? This is a very costly item. Will VDOT entertain a debris shield line item?  
Answer   Date: 3/9/2016 11:45:15 AM
The Contractor shall contain all debris/construction material during demolition and new construction associated with work items bid as part of this contract. The cost of equipment and material necessary to control debris shall be included in the price bid for the appropriate items.  
 
Subject: Locations Type: Proposal
Question Date: 3/8/2016 9:50:21 AM
Are there any locations Vdot has in mind?  
Answer   Date: 3/9/2016 11:44:39 AM
See page 168 of the contract listing planned structure locations.  
 
Subject: As-Built Plans Type: Plan
Question Date: 3/2/2016 9:23:16 AM
Will there be as-builts available? As of now there are none on Falcon or the District page.  
Answer   Date:
 
 

Displaying questions 1 - 6 (of 6)