Project Info
Order Number
UPC
State Project Number
Last Date to Post Questions
G19
102705
(NFO)BRDG-966-119, C501
8/22/2014
Search Questions
Search
Question Type
All
Plan
Proposal
Bid Sheet
Permits
Specifications
Other
Question Type must be selected.
The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered.
Export Q&A
Question List
Subject:
NATIONWIDE PERMIT 3 - MAINTENANCE
Type:
Specifications
Question
Date:
8/22/2014 4:46:48 PM
Can creek be pumped around to perform work in dry condition and expedite construction? The sequencing shown requires multiple coffer dam construction, removal and prolongs construction duration and adds inconvenience to traveling public?
Answer
Date:
8/25/2014 3:11:38 PM
Contractor shall bid on the advertised plans. Any proposed modifications would be subject to review by the applicable reviewing agencies and would be reviewed in accordance with the environmental permits within the contract proposal, and Section 104.02(b) of the Specifications.
Subject:
Spec. Page Pg 163 If bedrock encountered?
Type:
Specifications
Question
Date:
8/22/2014 4:33:20 PM
If bed rock is encountered, will additional time and price be negotiated to excavate and modify work accordingly?
Answer
Date:
8/25/2014 3:14:11 PM
Please refer to the Road and Bridge Specifications section 102.04- Examination of Site of Work and proposal and Section 104.03-Differing Site Conditions.
Subject:
304 Construction Density Control Strips
Type:
Specifications
Question
Date:
8/22/2014 4:31:27 PM
Will VDOT be bearing costs of performing density tests?
Answer
1 previous answer(s)
Date:
8/25/2014 3:13:34 PM
For asphalt concrete, it is the responsibility of the contractor to perform QC test with cost to be included in the asphalt products. For soils and aggregate base material, acceptance testing for density is performed by the Department.
Subject:
303.06 Borrow Material
Type:
Specifications
Question
Date:
8/22/2014 4:30:39 PM
Under which payment item will borrow material be paid under?
Answer
Date:
8/25/2014 3:08:07 PM
Borrow is not anticipated for this project; if required, it will be incidental to other pay items.
Subject:
Guardrail / GR-2 w/ 8 ft post
Type:
Proposal
Question
Date:
8/12/2014 7:58:38 AM
Please confirm Item 13320 GR-2 will require all 8 ft post as depicted on July 31st revision page 222 (Plan View - Ruffian Dr).
Answer
Date:
8/13/2014 4:30:59 PM
Yes, 8 ft posts are required
Displaying questions 1 - 5 (of 5)
Page:
1
First
Previous
Next
Last
Construction Advertisement Bulletin Board (CABB)
Update Profile
CABB v2.0
© 2008 Virginia Department of Transportation
5/11/2024 4:48:48 AM
2008