Subject: NATIONWIDE PERMIT 3 - MAINTENANCE Type: Specifications
Question Date: 8/22/2014 4:46:48 PM
Can creek be pumped around to perform work in dry condition and expedite construction? The sequencing shown requires multiple coffer dam construction, removal and prolongs construction duration and adds inconvenience to traveling public?  
Answer   Date: 8/25/2014 3:11:38 PM
Contractor shall bid on the advertised plans. Any proposed modifications would be subject to review by the applicable reviewing agencies and would be reviewed in accordance with the environmental permits within the contract proposal, and Section 104.02(b) of the Specifications.  
 
Subject: Spec. Page Pg 163 If bedrock encountered? Type: Specifications
Question Date: 8/22/2014 4:33:20 PM
If bed rock is encountered, will additional time and price be negotiated to excavate and modify work accordingly?  
Answer   Date: 8/25/2014 3:14:11 PM
Please refer to the Road and Bridge Specifications section 102.04- Examination of Site of Work and proposal and Section 104.03-Differing Site Conditions.  
 
Subject: 304 Construction Density Control Strips Type: Specifications
Question Date: 8/22/2014 4:31:27 PM
Will VDOT be bearing costs of performing density tests?  
Answer   1 previous answer(s) Date: 8/25/2014 3:13:34 PM
For asphalt concrete, it is the responsibility of the contractor to perform QC test with cost to be included in the asphalt products. For soils and aggregate base material, acceptance testing for density is performed by the Department.  
 
Subject: 303.06 Borrow Material Type: Specifications
Question Date: 8/22/2014 4:30:39 PM
Under which payment item will borrow material be paid under?  
Answer   Date: 8/25/2014 3:08:07 PM
Borrow is not anticipated for this project; if required, it will be incidental to other pay items.  
 
Subject: Guardrail / GR-2 w/ 8 ft post Type: Proposal
Question Date: 8/12/2014 7:58:38 AM
Please confirm Item 13320 GR-2 will require all 8 ft post as depicted on July 31st revision page 222 (Plan View - Ruffian Dr).  
Answer   Date: 8/13/2014 4:30:59 PM
Yes, 8 ft posts are required  
 