Project Info
Order Number UPC State Project Number Last Date to Post Questions
F67 102704 1421-088-624,M501,B633,B634 5/23/2014
Search Questions
Search
Question Type  
    The last date to post questions has passed. Any questions posed 72 hours before the letting date may not be answered. Export Q&A    
Question List
Subject: Backfill for Water & Sanitary Sewer Type: Other
Question Date: 4/24/2014 11:11:37 AM
Does the water line and sewer line below paved areas get backfilled w/ 21-A?  
Answer   Date: 5/15/2014 10:56:56 AM
The plans call for water and sewer bedding and backfill to be in accordance with VDOT St’d. UB-1, Type 2.  
 
Subject: Receipt of Bids Type: Other
Question Date: 4/18/2014 2:50:44 PM
There is a rumor that the bid letting for this project will be delayed. Any truth to that?  
Answer   Date: 4/18/2014 3:04:45 PM
The receipt of bids for this project has been delayed until May 28th.  
 
Subject: Spec. Page Pg 114 If bedrock encountered? Type: Specifications
Question Date: 4/18/2014 12:35:39 PM
If bed rock is encountered, will additional time and price be negotiated to excavate and modify work accordingly?  
Answer   Date: 5/22/2014 2:03:35 PM
The bidder should refer to the Road and Bridge Specifications section 102.04- Examination of Site of Work and proposal and Section 104.03-Differing Site Conditions.  
 
Subject: 303.06 Borrow Material Type: Specifications
Question Date: 4/18/2014 12:27:18 PM
Under which payment item will borrow material be paid under?  
Answer   Date: 5/22/2014 2:03:06 PM
Borrow is not expected on this project.  
 
Subject: 304 Construction Density Control Strips Type: Specifications
Question Date: 4/18/2014 12:11:51 PM
Will VDOT be bearing costs of performing density tests?  
Answer   Date: 5/22/2014 2:04:03 PM
For asphalt concrete, it is the responsibility of the contractor to perform QC test at no additional cost to the department in accordance with current specification . For soils and aggregate base material, acceptance testing for density is performed by the department.  
 
Subject: Deletion of Section 105.08 located on pages 106-109 Type: Specifications
Question Date: 4/18/2014 10:34:25 AM
As this section has been deleted, is it correct to assume VDOT will coordinate with Comcast, DVP, Verizon and relocate utilities prior to contractor commencing box culvert installation? Is it also correct to assume any fee or cost of these utility relocation and or protection will be borne by utility owners and/or VDOT?  
Answer   Date: 5/22/2014 2:04:27 PM
VDOT has coordinated with Comcast, DVP & Verizon these utilities will be relocated prior to construction. Relocation for Comcast, DVP and Verizon will be borne by utility owner.  
 
Subject: Cooperation with regard to utilities Type: Proposal
Question Date: 4/7/2014 2:45:12 PM
The special provision for section 105.08 located on pages 106-109 is non-standard and seems unreasonable. Please consider deleting this from the contract.  
Answer   Date: 4/9/2014 8:18:46 AM
This provision is necessary to construct the project.  
 
Subject: Cofferdams Type: Proposal
Question Date: 4/7/2014 2:34:52 PM
Although the permits require the use of cofferdams upstream and downstream of each box culvert location, no contract item exists for them. Please advise.  
Answer   Date: 4/10/2014 2:08:05 PM
Note 4 on pages 3B and 4B(1) state the cost of the diversion is to be included in the price for the box culvert.  
 

Displaying questions 1 - 8 (of 8)