Subject: Permanent Signage Type: Plan
Question Date: 1/28/2025 10:59:40 AM
Plan Sheet 7(2) shows for one new permanent sign to be installed on sheet IJ(4), yet there are no permanent signs on that Phase 2 plan sheet. Please clarify where this one sign is to be installed.  
Answer   Date: 1/29/2025 5:03:15 PM
Sheet 7(2) is referring to the "ONE WAY" sign that is to be relocated out of the temporary pavement area at approximately Station 117+25. Note the existing “ONE WAY” sign is shown by dashed arrow line and shows the new sign location in the median by solid arrow line.  
 
Subject: Miscellaneous Concrete, Service Road, Gravel Diaphragm Type: Proposal
Question Date: 1/27/2025 6:10:50 PM
Please provide the following information: 1. Please inform whether the concrete used in modification of manhole EX-6 (Sheet IK(4)) will be paid under Item 290, Concrete Class A3 Misc. If not, under which item this work will be paid. 2. Sheet IJ(5) shows potential service road to access RW-3 retaining wall construction. There is no pay item for this work. Is it to be considered incidental to retaining wall construction, or it will be paid under other bid items. 3. What is the pay item for gravel diaphragms as shown on Sheet IK(5)?  
Answer   Date: 1/29/2025 5:01:23 PM
1. Yes, will be paid under item 290. 2. The earthwork required for the service road has been included within Item 0080 (303SD20-0001 Regular Excavation) and Item 0090 (303SD20-0007 Borrow Excavation). The breakdown of these items can be found on Sheet 2D(6). The aggregate specified for the access road has been quantified under Item 0190 (308SD20-0008 Aggr. Matl. No. 25 or 26) and can be found on Sheet 2D(3). 3. The pay item for the gravel diaphragms is Item 0020 (302SD20-0002 Bedding Matl. Aggr. No.57) and can be found on sheet 2D(3).  
 
Subject: Bid Due Date Discrepancy Type: Proposal
Question Date: 1/16/2025 10:04:31 AM
On the first page of the bid proposal and contract document it states a bid due date as Wednesday, January 22, 2025 at 10AM. However, on CABB and Bid Express the date is listed as February 26, 2025. Will we be expecting an addendum to address this discrepancy?  
Answer   Date: 1/16/2025 1:27:48 PM
Yes, addendum forthcoming. Thank you.  
 
Subject: Missing files on Bidx website Type: Other
Question Date: 1/14/2025 4:56:17 PM
This letting is currently not on the Bidx website, so the AASHTOWare file is missing.  
Answer   Date: 1/15/2025 8:26:44 AM
This has now been uploaded.  
 